电解槽用部分规格母线生产实践-草稿(Practice of partial specification busbar production for electrolytic cells - draft).docVIP

电解槽用部分规格母线生产实践-草稿(Practice of partial specification busbar production for electrolytic cells - draft).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电解槽用部分规格母线生产实践-草稿(Practice of partial specification busbar production for electrolytic cells - draft)

电解槽用部分规格母线生产实践-草稿(Practice of partial specification busbar production for electrolytic cells - draft) Production practice of partial specification busbar for electrolytic bath Baotou aluminum plant after the two phase of the expansion of one hundred and fifty thousand tons after the need for various types of aluminum bus, electrolytic four factory took part of the specifications of the casting task. In order to produce high quality bus, we must master the production process of the bus, analyze the causes of various busbar defects and correct the process parameters. In our factory staff production, we still use the method that the master takes the apprentice and each practice to sum up, and it causes some employees to have the problem that the production skill is not high or will not understand. Summarizes some specifications bus production practice, hoping to improve each other. The four level of foundry production plant using electrolysis, by a mixing furnace, groove, tundish and mould, a VVVF traction machine, a synchronous saw and raceway. Production preparation In the production of the bus, preliminary preparation is a very important link, directly related to whether the bus can be pulled out or pulled out of the quality of the bus. Therefore, great efforts should be made to do the job well. 1 aluminum liquid Using a 24T silicon carbide furnace automatic temperature control mixing electrolysis plant four, power supply two independent control cabinet. According to the different temperature of aluminum liquid, the power supply is controlled by a single power supply, and the power supply is controlled by the simultaneous transmission of the two units or the power failure at the same time. Because of casting aluminum temperature between 690-720 degrees, according to the channel length (about seven meters) was launched in 760 - 780 between the furnace temperature control is appropriate. The temperature control, the special attention is, after start of production if t

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档