尤尼佳SUC_MC_FICO_VariancesHandling_030822_V1_EN.docVIP

尤尼佳SUC_MC_FICO_VariancesHandling_030822_V1_EN.doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Clearing procedure of the variance account balance With standard costs of inventory, R3 automatically posts its variant amounts to the variance account. The posting itself is automatically by R3, however, for actual inventory values, user have to make the following FI documents manually at monthly end or yearly end. R3 materials and items unit-costs As R3 basic settings, there are standard costs, moving average (real-time, not monthly average) and lowest valued. Currently, we would not take the moving average, due to the following issues that UC has to solve and identify. The unit cost calculations of moving average may be biased, in the case inventory is very low or minus (*1). When that wrong invoices were entered and the goods were already issued, UC needs to have FI documents entry for the revise. (*1) Due to delayed timing of goods issues and receipts from Barcode and PF systems Technically also, it is impossible to have moving average for product costs at factory, since this first phase does not implement R3 production orders. Items with variance 2-1. Purchase items The items (*2) purchased and stocked with R3 MM. When the invoice and PO price is different from the unit cost of the items, R3 posts the variant amount to the variance accounts automatically. (*2) Materials, parts (now on discussion, which could be on R3 MM.) 2-2. Manufacturing items The manufacturing items include the free of delivery. User will post the balance between the debit amount (material and in-direct costs, etc.) and credit (product’s standard costs) of manufacturing cost account, to its product inventory account and COGS. We have one R3 costs center to collect the actual costs. In addition, the wrapping fee, we suppose, UC will post its variance to the expense account only and directly. Example procedure 3-1. User posts the variance of material items by the following steps. User finishes the invoice verification that UC received goods on the previous month. Following the be

文档评论(0)

文档集锦 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档