- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
下载电子课件unit 5
Construction is the translation of a design to reality. It is as important and complicated as the design in order that the structure will perform as it was intended to and the work is finished within the required time at the lowest cost. The designer must be in close contact with everything that is done during the construction work so that any changes in the site conditions, materials and work being done can be evaluated and, if necessary, corrected or improved. The constructors should have the same knowledge of the working-plan as the designer. They must also know the details of the design and must understand any unusual aspect of the design. In fact, the constructors should go to the engineers for information and advice during the design stage so that the plans do not call for something that cannot be built economically. Both the designers and constructors must always work in harmony. More workers are employed during the peak period. The employees should be given training for working skills and knowledge about quality and safety as early as possible. It will improve the working efficiency a lot. The construction work can be divided into a number of stages: 1. Evaluation of plans, specifications, basic demands and features of the site 2. Plan and speed of the job 3. Making the site ready 4. Building the structure 5. Cleaning up The first stage of evaluation consists of a careful study of demands of design and of the site itself. Too often this is not done until the third and fourth stages are under way, which is far too late. The second stage is most important if the job is to be done economically. The equipments, labor and materials for each stage in the construction must be provided at the correct time. The third includes constructing access roads, making warehouse, crushers, concrete mixers, offices and housing for the workmen ready. Of course, this work is often just the beginning, the arrangements are changed several times during the progress of the work. T
您可能关注的文档
最近下载
- 《仪器分析—分光光度计》学科知识考试题库(附答案).docx VIP
- 年产770吨精细化学品改扩建项目(达得利公司)环境影响报告.pdf
- JCT 899-2016 混凝土路缘石.docx VIP
- JB T 3695-2008 电动葫芦桥式起重机 标准.pdf VIP
- 桥梁桩基施工专项方案(新编制) .pdf VIP
- 马拉松赛事赛事组织管理与赛事赛事经济效益评价报告.docx
- (GBT7588 1—2020)电梯制造与安装安全规范.pdf VIP
- 电子焊接培训课件.ppt
- 纪念中国人民抗日战争暨世界反法西斯战争胜利80周年主题党课PPT(优质ppt).pptx VIP
- 管幕顶进施工方法及装置.pdf VIP
文档评论(0)