组织文本文档(Organize text documents).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
组织文本文档(Organize text documents)

组织文本文档(Organize text documents) Construction deployment and preparation (1) according to the situation, combined with the manpower, materials, machinery and equipment, capital, construction method, contract provisions to use conditions, conditions of contract; the full deployment of construction tasks, reasonable arrangements for the construction sequence, construction scheme of the main project; (2) for qualitative and quantitative analysis on the construction scheme of project may by the way, through the technical and economic evaluation, choose the best scheme. A and construction power supply: the construction unit has connected the power supply to the construction area for power supply on the construction site. If the total power consumption does not meet the requirements, the reinforcement, welding machines and other large capacity machinery are arranged at night, so as to avoid the peak power consumption and meet the construction electricity demand. B, construction water: construction units have been connected to the scene to meet the requirements. C, construction road: has been able to meet the construction requirements. Edit the layout of the construction site The construction plan is the overall arrangement of the construction plan and the construction schedule in space. It is put into a variety of resources, materials, components, machinery, roads, electricity and water supply networks productionlife venues and a variety of temporary engineering facilities reasonably arranged at the construction site, the site can be organized and civilized construction. Edit the overall construction schedule of this section (1) the construction schedule reflects the best construction scheme in time, the plan form, time, cost, resources, calculated and adjusted to optimize the allocation, in accordance with the project objectives; (2) the process is carried out in an orderly manner, so the duration, cost and resource optimize to achieve the goal, on the basis of the prepar

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档