散货船设计要点.pptVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
散货船设计要点

Introduction Operational and Regulatory Challenges ? Design Challenges Examples: Cargo Residues Excessive Loading Rates IMSBC Code MARPOL Annex V (Garbage) and Cargo Residues Definitions Cargo Residue is defined as garbage in guidelines Cargo hold washing water not defined – although interpreted as garbage Requirements Must be discharged when greater than 12 nm from shore Cannot be discharged in a special area Special Areas a Problem Bulk carriers generally not design to handle washing water Adequate port reception facilities for washing water MARPOL Annex V (Garbage) and Cargo Residues Recent special areas Gulfs Area became effective in August 2008 Mediterranean Area became effective May 2009 Reception Facilities in Special Areas (Gulf and Med) PRF must be in place before special area becomes effective MEPC 59 Intercargo and BIMCO paper Circular issued (MEPC.1/Circ. 675) Next steps Continuation of review of Annex V Possible IMSBC Code reference to discharge requirements? Design Issues Handling hold washing water Can be problematic Holding tanks Pumps – large particles Cargo properties Coatings (PSPC?) Ballast water management systems Hold cleaning systems Possible treatment systems Design Issues Design Issues Bulk Carrier Loading Rates Terminal requirements Buoyant market → queuing → optimising loading Ponta da Madeira - Brazil 16 000 t/hr Minimum ballast 14 hr turnaround Intercargo Survey Key Findings: 85% of masters indicated that they considered such a rate of loading to be beyond the safe operational limits of their vessel: Manoeuvrability Hull structure Two thirds of respondents stated they had concerns with regard to structural stresses if loading at such a rate. Validation of Masters Views Manoeuvrability Study – BMT SeaTech Concurred with Masters opinion ABS study Confirmed many risks Submission of paper to IMO MSC 84 (MSC 84/INF.8) Referred to DSC 13 Considered by Correspondence Group reviewing BLU Code Reports to

文档评论(0)

asd522513656 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档