- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
嘻嘻,难得的ED案例哦! case 1 the production line
Case study 1: the production line
Introduction
In flow line production, the production equipment is laid out in the production sequence. The products usually follow the same route through the system. This type of system is frequently very sensitive to equipment breakdowns, because if one process stops, this stops the entire line. Having stock between each process can reduce this sensitivity. Flow line systems are most useful for medium to long production runs.
1.2 Description of the situation
A factory producing a range of vehicles is considering adding a new high quality trailer to the range. Because a competitor has ceased to trade, it is believed that substantial sales can be expected over the coming years. To meet this anticipated demand, a new assembly line is planned which will be equipped mainly with robots.
The trailer assembly can be divided into five main operations. A single robot carries out each operation. At the first operation (A), the axles and wheels are fitted to the frame. This is followed by mounting the underside onto the frame (B). The vehicle sides are then attached (C) followed by the roof (D). The final assembly operation and quality check (E) is not automated, as customers often have special requirements. See figure 1.1
Figure 11: The production line
All the parts used for the assembly are standard. There are several types of some parts, but these have no effect on the processing speed. Also, there is always an adequate stock of parts to supply the line.
Although the first four processes are fully automated, it has not been possible to synchronize them precisely. Axle to frame assembly (A) takes an average of 15 minutes, as does attaching the underside to the frame (B). Assembling the sides to the frame (C) requires an average of 18 minutes, and the roof assembly (D) is a precision process and only three trailers per hour can be completed. Final assembly and quality check (E) is a manual operation and take an av
您可能关注的文档
- 信息流广告投放策略分析..pptx
- 做个太阳能热水器的反思.doc
- 做月饼其实就是这么简单---广式月饼).doc
- 停车列检库、联合检修库、物资总库及辅助生产车间监理实施细则.doc
- 做合格共青团员团课做合格团员课件0.pptx
- 催化裂化富气压缩机学习培训资料.ppt
- 催化裂化工艺技术新进展2012.ppt
- 催化裂化工艺的前景展望.ppt
- 催化裂化汽油加氢改质GARDES技术.ppt
- 先锋高科技(东莞)有限公司岗位职务说明书.doc
- 嘻嘻,难得的ED案例哦! case+2+the+supermarket.doc
- 四川东创科技园投资有限公司员工手册.doc
- 四川号百呼叫中心-呼叫中心数字化管理-现场管理排班管理.doc
- 四川大邑项目旅游发展概念性策划方案定位研究战略定位项目架构.doc
- 四川彩雪服饰有限公司拓展管理手册.doc
- 四川某商业大楼监理细则.doc
- 四川某建筑工程公司企业文化手册.doc
- 四川某筏板满堂基础高层框剪结构职工住宅小区21#、22#楼施工组织设计.doc
- 四川电信存量经营体系咨询及精细化营销运营项目—成都电信单固话升级至e26精细化营销活动培训资料.doc
- 四川电力企业资源管理系统实施建设 最终用户培训 SEPC_ERP试点阶段_PM模块_生产检修管理课程.doc
文档评论(0)