化验室试题(Laboratory examination questions).docVIP

化验室试题(Laboratory examination questions).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
化验室试题(Laboratory examination questions)

化验室试题(Laboratory examination questions) 1, the three stage of cement production is preparation of raw materials, clinker burning, cement made. Four kinds of minerals, 2 Portland cement clinker is three, calcium silicate, calcium silicate two aluminum acid calcium, three ferritealuminate four calcium oxide; four kinds of Portland cement clinker are calcium oxide, silicon dioxide, three two aluminum oxide ferric oxide; modulus of clinker are saturated lime silicate, alumina ratio coefficient the rate of. 3, in order to ensure the accuracy and reproduction of the inspection data, the laboratory shall organize the password check and operation assessment for each inspection post, and the production control posts shall be no less than 4 samples per person per month. 4, cement before leaving the factory, according to the same species, the same strength level number and sampling, bagged cement and bulk cement should be number and sampling, each number is a sampling unit. 5 cement production control in routine determination of moisture of material is the content determination of adhesion of water, with water to prevent the infrared drying cold touch lamp bulb so as to avoid the rupture of bulk samples should be broken into the following 20mm determination, gypsum moisture determination when the temperature is 55 to 60 DEG C. No infrared lamp shall be used. When the moisture content is measured in a drying oven, the temperature is controlled at 105 - 110 DEG C in general. 6. when using the tray balance, the weights are placed on the right side of the scales, and the weights are placed on the left of the balance. 7. the temperature of the grinding cement should be lower than 135 degrees centigrade. First, fill in the blanks: (40 points, 2 points per hour) 1, the main minerals of Portland cement clinker with three calcium silicate, calcium silicate, calcium aluminate two, three ferritealuminate four calcium oxide, mainly calcium oxide, silicon dioxide, aluminum oxide, ferric ox

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档