- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方回填的技能请求(国外英文资料)
土方回填的技术要求(国外英文资料)
The stabilization of small reservoirs in dingyuan county
Land reclamation technical requirements
The backfill of the earth square shall be carried out after the acceptance of the box containing structure.
The soil shall be cleaned up and drained before the land is returned, and the water will be drained after the inspection.
Three, the box contains item two meters below to be compacted by artificial and small machine, the place that USES artificial wooden hammer to be compacted in the place where mechanical compaction is not made. The thickness of the layer should not exceed 20 centimeters per layer, and the box should be balanced on both sides. The height should not be greater than 20cm.
The sides of the box and the surface of the rock shall be applied to the clay slurry at the top of the ground.
The contents of the box shall be in accordance with the design requirements, and the maximum dry density and optimum moisture content should be obtained by the test units concerned with the qualification.
The backfill soil shall strictly control the moisture content, and shall not be wet and dry, such as water content which is not in accordance with the requirements and should be taken.
Seven, artificial backfill each layer of soil on both sides of box culvert ring dao should do at least one group, rear can meet the design requirements of compaction degree is the second layer soil, 30% supervisory selectiving examination according to the requirement of parallel cutting ring test as supervision inspection.
Eight, box culvert top 2 meters using mechanical backfill thickness of each layer of soil shop should do at about 30 cm and compaction test parameters, general bulldozers is 8-10 times, excavator compaction 6-8 times, demanding a cutting ring test a group of 100 m3.
9, manual backfill and mechanical backfill surface of the surface of the soil are required to make the plane.
The surface of the dam should be cleaned up before the dam is grown. The embankm
您可能关注的文档
最近下载
- 2023年一级建造师工程经济历年真题章节练习题集.pdf VIP
- 《肺结核病报告转诊制度》.pdf VIP
- 脑梗塞ppt课件(精).pptx VIP
- 高血压、糖尿病培训试题(附答案).docx VIP
- pixelgridV4.5高分辨率卫星影像数据处理系统卫片使用手册.pdf VIP
- 贵州财经大学 法学综合(民法、经济法)A卷 2018年考研专业课真题.pdf VIP
- 2025年河南省高考对口升学烹饪试卷 .pdf VIP
- 贵州财经大学 法学综合(民法、经济法)B卷 2018年考研专业课真题.pdf VIP
- 论刑法中多次犯的理论与实践剖析:从概念厘定到司法适用.docx VIP
- 17J008 挡土墙(重力式、衡重式、悬臂式)(必威体育精装版).pdf VIP
文档评论(0)