- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地下电缆施工计划(国外英文资料)
地下电缆施工方案(国外英文资料)
The depth shall also consider the final road elevation and the depth shall meet the specification. Where cabling conflicts underground pipe, necessary protection or deeper problems would be applied.
5) trench when the stiffness of the pavement materials should be on both sides and lower fine soil scattered in cable trench, so that after the cable laying from the ditch beside the fine soil covering the cable (or to the soil in outward to the scene). Ditch on both sides should remain 0.3 m wide aisles, and staff, and to prevent the river bank stones and other hard objects fall into the ditch Excavated materials shall be tipped along the both edge of trench and hard material and find soil shall be separated. The find soil will be 2 for cable bury (surplus Excavated material will be shipped out of site). 0.3 m wide walkway on both edge inside trench shall be provided.
6) digging ditches should be considered when the soil conditions and adjacent building facilities, make measures to prevent landslides and endanger the safety of the near building Measure shall be seems to prevent the collapse and any damage to buildings in the vicinity.
7) when digging a ditch, you should set up a fence, warning signs, and a Red light Barricade and warning mark shall be set up. Red light shall be provided at night time.
Cable Cable Pulling
1) there are two common methods for laying a cable, namely artificial laying and mechanical traction. Either laying method in order to ensure the quality of construction personnel safety and cable construction, all need to use cable securely mounted in the pay-off rack (or cable with a crane to lift). Erection of cable tray, cable tray to the direction of the arrow on the coil to the intended location, then wear the steel shaft in the wire disc axle hole, the strength of the steel shaft and the length should be combined with a cable tray weight and width, make the line plate can move freely. Our human laying cable, it is proposed in th
您可能关注的文档
- 户内环氧树脂浇注工艺(国外英文资料).doc
- 013缆沟开挖安稳交底(国外英文资料).doc
- 11G101-1板教材(国外英文资料).doc
- 10吨载重汽车悬架系统设计(国外英文资料).doc
- 11G101中钢筋的绑扎搭接长度的计算(国外英文资料).doc
- 1举例说明古埃及金字塔的演变及特色(国外英文资料).doc
- 2.4.2 选择、投影和连接运算(国外英文资料).doc
- 2006年河南省造就工程造价员资格测验真题(国外英文资料).doc
- 2007年度临安市村饮用水义务总结)(国外英文资料).doc
- 2009年家当园区消防义务总结(国外英文资料).doc
- 地下室剪力墙混凝土浇筑技能交底(国外英文资料).doc
- 地下车库汽车坡道设计标准(国外英文资料).doc
- 土木工程 卒业设计 五层办公楼修建结构设计 摘要(国外英文资料).doc
- 在涂估中差异应用触变性流变剂和假塑性流变剂(国外英文资料).doc
- 地区修建(国外英文资料).doc
- 地梁钢筋连接位置(国外英文资料).doc
- 地下车库设计注意事项(国外英文资料).doc
- 地源热泵技能在家当厂房中央空调系统中的应用(国外英文资料).doc
- 地貌划分(国外英文资料).doc
- 地球椭球体(Ellipsoid)、大地基准面(Datum)及地图投影(Projection)三者的基础概念(国外英文资料).doc
最近下载
- 2025年天津市中考英语真题卷(含答案与解析).pdf VIP
- 工商银行swift代码大全.pdf VIP
- 文献检索与科技论文写作 课件全套 第1--9章 绪论、科技文献检索基础知识---科技论文的投稿.pdf VIP
- 《企业安全生产主要负责人和管理人员培训课件》.ppt VIP
- 宠物临床诊疗职业技能评价规范 宠物医师助理.pdf VIP
- 等离子体电极用碳化铪粉末、其制造方法、碳化铪烧结体和等离子体电极.pdf VIP
- 湖南师大附中2022-2023学年高一下学期期末数学试题含答案.pdf VIP
- 温室气体(GHG)管理手册.doc VIP
- SBS改性沥青防水卷材施工方案.docx VIP
- 多相流体的数值模拟及计算方法.pdf VIP
文档评论(0)