- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土石方工程施工请求及质量检测(国外英文资料)
土石方工程施工要求及质量检测(国外英文资料)
The hand is in a ball, the ground is scattered;
Fill the area with drains to eliminate surface water.
4, the prevention measures that are not required for backfill soil compaction:
When the soil is not suitable for the requirement, the earth shall be excavated and reclaimed or added to the material of solid backfill of lime and gravel.
If the water content is too large, it can be loosened, dried, dried or mixed into dry soil.
Use high power compaction.
Prevention of landslide: keep the slope of the slope strong enough; Try to avoid too much static and dynamic load on the top.
Quality requirements and testing methods:
1, flat ground: flat area of the slope and design difference should not exceed 0.1%, drain slope of the requirements of the design and not more than 0.05%, no request in design, for not less than 2% of the gradient in the direction of the drain.
2, the floor level allows for deviation:
Surface elevation: manual cleaning up plus or minus 30MM, mechanical cleaning: plus or minus 50MM.
Length, width (measured by the design center) should not be small;
The surface of the slope of the slope of the slope is flat, not to be steep, and the construction of mechanical construction should not be steep.
Ground, surface ground: horizontal elevation 0 ~ -50mm, the level is less than 20MM.
The basic processing must conform to the design requirement or the specification of the construction specification.
4, backfill soil materials must conform to the requirements of the design or construction of the norms, such as gravel soils, sand blasting and stone slag particle size is not more than two-thirds of each floor shop to fill, can be used under the surface of packing; The water content complies with the viscous soil of the compacted requirement, and can be used as the packing of all layers. Silt and silt soil, which cannot be used for stuffing.
5, backfill soil must be in accordance with the provisions, layered ram pressure dense: mechanical layer