- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地下室剪力墙混凝土浇筑技能交底(国外英文资料)
地下室剪力墙混凝土浇筑技术交底(国外英文资料)
Cooperate with each other in a timely manner.
Mouth leveling: 9. The wall concrete vibratory finished, will be flowing out of steel and arrange them, wood float line according to the elevation control (1 or 2 cm higher than the bottom of the roof), the surface leveling. Pay attention to the sealing of the site of the construction.
Do the construction of concrete insulation and test block. Wall concrete block as required field should take a set of standard curing test block, spare piece of a group (such as concrete volume is big, should be in accordance with the requirements of test), 1 ~ 4 groups with the condition maintenance test specimen: 1 set to test intensity of 7.5 MPa, a set of testing strength of 1.2 MPa. Winter: concrete should be increased 2 set of block 1 set of critical strength, frost resistance measurement about 27 d, should be combined with temperature, the temperature dropped to antifreeze in structure temperature before testing, determine whether more than antifreeze critical strength 4 mpa, such as short of 4 mpa, continue to cool, it could freeze, should increase heat preservation, heat curing measures, such as strength of cold noodles more than 4 mpa; The other group measured the intensity of the temperature in winter, and then maintained the 28d after winter.
11. On the same terms and conditions of concrete test report data provided by the good control of time to dismantle (with conditions block intensity reached 1.2 MPa), when the split mould wall non-stick mold, no corner, no cracks, no coagulation + quality defects, to achieve smooth level off, the quality requirements to achieve the requirement of the specification, maintenance according to the actual conditions with different methods. The demolition module must be approved by the technical director of the project department, otherwise it will not be removed.
Wall concrete curing: the concrete of the wall should be patted by special people. Water spray curing should