013缆沟开挖安稳交底(国外英文资料).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
013缆沟开挖安稳交底(国外英文资料)

013缆沟开挖安全交底(国外英文资料) The occurrence of vulnerable accidents such as bad and bad cable. Survey results will be drawn both underground cable route map station and the new project of cable route diagram on-site technical clarificaiton, to explain the investigation of underground obstacles path zone and treatment methods. 3 construction license system, insist on, before the construction, should get in touch with both facilities vascular unit, agreement and signed the relevant construction safety, strive for the understanding and support, must not blindly excavation, avoid the happening of the construction. The excavation of the cable trench shall be dispatched to the driving room duty, and the protection personnel shall be set up at the site to strengthen the effective contact within and outside the room. When the station officer discovers the equipment malfunction alarm, inform the construction leader immediately to conduct the inspection and processing. 5, in conjunction with the administrative units of equipment to the site, every 10 m perpendicular to both the cable route digging exploratory trench, determine both the cable line, cable quantity, type, purpose and the direction of the buried depth, and sprinkle with white lime. 6, in the high slope protection, excavation, narrow shoulder area (cable first, after excavation) should be taken to assault excavation or concentrated force, strictly control the excavation scope, do on the day of the excavation, laying on the same day, the day backfill compaction, digging soil have striped cloth, ensure clean ballast. 7, before the excavation construction, head of the choice of path to the right, as far as possible avoid dangerous ditch area, such as arranging experienced when you dont leave the Lao shifu shift of light plane light dig, dig and clear, and strengthen site monitoring; The white lime is sprinkled on the road, and it is a warning sign that there is an existing cable under the white lime.In the construction, the

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档