- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
右线现浇梁线形操纵论文(国外英文资料)
右线现浇梁线形控制论文(国外英文资料)
40 + 64 + 40) M prestressed concrete
Continuous channel beam linear control
Author: qi yanwu
(China iron 15 group 7)
Abstract: during the construction of the large span groove, the stability of the bridge is increased by using the steel structure such as the military pier and the berley frame. Bridge upper structure of the lateral steel template, outside the inner cavity mould using bamboo veneer, steel pipe frame support, using the linear monitoring and control measures, this process in the cast-in-place beam construction control got very good effect.
Keywords: linear control of steel structure settlement
1 overview
Southwest of taiyuan railway engineering circle across too boc right trough type continuous beam, the main line bridge plane located at R = 2000 m round curve, the main use 40 m + 64 m + 40 m across three variable cross-section continuous groove type beam structure, the continuous channel beam in curve segment, minimum radius of 2000 m. The bridge is 145.1 m, total width 10.8 m, and the inner net is 6.9 m. The span of the beam is 3.5 m, and the beam is 4.3 m high, and the beam is 5.6 m high, and the top of the beam is changed by the circle curve, the radius of the curve is 260.65 m. The wall height is 0.7 m, the base is 0.25 m, and the width is 0.2 m. The width of the longitudinal girder is 0.3 m ~ 0.4 m. The roof thickness 0.47 m, the thickness of the bed board is 0.45 m, the base of the branch is set to the beam, the height 1.25 m, the width of the branch is 1.1 m, and the width of the branch is 1.5 m.
The total length of the bridge is 34.0 m, the length of the section A2 is 25.0 m, and the length of the span is 2.5m, and the length of the span is 28.05 m.
FIG. 1 40m + 64m + 40m grooved
Figure 2 40m + 64m + 40m groove current cast-in-place
Construction considerations
The monitoring and control of the stress, deformation and stability of the construction of the upper structure of the bridge are monitored and controlled.
(1) to furt
文档评论(0)