吊车梁预制计划(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
吊车梁预制计划(国外英文资料)

吊车梁预制方案(国外英文资料) The formulation of the description: This scheme for changchun car depot 600000 tons/year fuel ethanol self-provided power plant turbine room crane beam precast construction and compiled, according to the process of concrete can be divided into 1, 2, steel bar 3 template, concrete three parts, and made the technology requirements of each process, technology, quality requirement and construction method. Second, the formulation basis: 1 construction manual; Quality control standards for concrete; 3 composite template specification (gbj214-89); 2, 4 reinforcement welding and acceptance procedures; Construction preparation: 1 construction site preparation There is enough construction site, the construction site is flat. The composite template is ready. Construction preparation Familiar with the construction plan; Material planning; To make up the technical background; Construction method: The floor is covered by the floor and the floor is covered with a flat bed. Weld steel mould and reinforce the concrete The ground is levelled and compacted. The ground should be laid with a 600mm pillow before the bottom die. 4, 3 template: 4, 3, 1 liang bang adopts the fixed section steel template, the template is made by the chemical construction lumber factory to the scene. 200 1200 Lap wood clipping LiDang sleeper Bamboo template brace tomsk The construction of the bottom die of the crane is used in the form of high strength coating, and the reinforcement is like the attached drawing. 4, 3, 3 the sleeper wood must be ground with the ground, prevent uneven settlement. The bottom template must be put on the ground and find the level, each section should be on the same level, the adjacent template face is not greater than 1mm. The four, three, and four shifts are mainly kept in the shape of the side, each other at 600 mm. The clamp is placed on the outside. On the top of the nail and on the timbers, the lower end of the nail and the sleeper. 4, 3, 5 steel templates, l

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档