剪力墙结构混凝土施工计划(国外英文资料).docVIP

剪力墙结构混凝土施工计划(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
剪力墙结构混凝土施工计划(国外英文资料)

剪力墙结构混凝土施工方案(国外英文资料) Shear wall construction plan Yanzhou questar park houses a-7 residential buildings Unit: yanzhou yonghua building installation engineering co., LTD Shear wall construction plan One, engineering situation: The engineering structure for the shear wall structure, layers of 3.9 m, the second layer of 3.6 m high, high standard of 2.9 m, building area: 10453.75 ㎡, height of 64.9 m. According to the characteristics of the engineering structure, the design requirements of the construction organization and the standard of construction quality acceptance, the project is prepared and executed in order to ensure the quality and construction safety of the project. Second, preparation for construction Material requirements and main tools: Using commercial concrete, concrete to manufacturer qualification, raw material certificate, test report in advance submit supervision department to review, when pouring concrete symbols, pouring the concrete volume in advance written notice to the concrete company, be prepared. Working conditions After the inspection of steel and steel, check the iron and block to ensure the thickness of the protection layer. Check the embedded parts of the wall, the reserved holes, the location of the pipelines, the number and the fixed conditions. Check and clean up the residue in the stencil and rinse with water. 2) check to see if the joints are tight, the corners are reinforced, and all kinds of fittings are strong. 3) the vibrating rod is ready for four and the pump is in place. Measuring equipment - the caving cone and the concrete test die. 4) check the power supply, the line, and prepare the night construction lighting. Should have the following quality records: The quality certificate of the cement factory. Cement approach test report. The sand subtest report Stone test report The combination of the concrete and the concrete Strength test report of concrete test block The evaluation record of the strength of the concrete Concrete

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档