剪力墙模板工程技巧交底(国外英文资料).docVIP

剪力墙模板工程技巧交底(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
剪力墙模板工程技巧交底(国外英文资料)

剪力墙模板工程技术交底(国外英文资料) Shear wall template technical disclosure Qujiang lanting 7 # building Technical background of shear wall template engineering First, preparation for construction (1) working conditions The template is numbered according to the wall, and it is applied to the molds, the oil oil: the diesel = 5:5, the specification is piled up. 2, axis play floor, wall body lines, Windows and doors hole position lines, pop-up axis partial floor 500 mm module and auxiliary line, clean and clear the wall body area of sundry, all lines have preview. 3, embedded column wall, the wall, even the beam reinforcement assembling finished, hydropower embedded box, box, embedded parts, and do a good job in inspection, reinforced protective layer and steel frame column fixture knot spacing, number should meet the design requirements, horizontal, vertical ladder tendons installed, reinforcement measures have reliable positioning. 4, doors and Windows and other reserved templates have been installed in place correctly, and have reliable connection with the wall steel. The base of the wall of the wall 10cm should be covered with flat press and a 20cm thick foam strip at the root, in case of the slurry under the template, and note that the sponge should not be inserted into the wall. Before the template is installed, the construction seam between the wall and the roof should be finished, and the wall and the wall between the wall and the wall are finished, and have been checked. 7, the shaft of the elevator shaft is pre-installed in front of the floor, and four 250 x 200mm reserved holes are set aside to support the four steel legs of the working platform. (2) material requirements Wall form template: the basement USES small steel model to assemble. More than 0.000 or more adopt the large steel template. The thickness of steel plate is not less than 6mm, and the large templates are connected by means of the enterprise. The matching type of steel Angle mold, the large mold is connec

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档