- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
CHAPTERDRILLING
6- PAGE 18
CHAPTER 6 DRILLING SYSTEM AND OIL (GAS) PRODUCTION PROCESS SYSTEM
6.1 General Provisions
6.1.1 The drilling system includes: drilling, cementing, logging, completion, work-over and oil/gas testing equipment and the related connection pipings installed on the platform and the ancillary equipment with associated pipings necessarily installed for wire-line logging, perforation and tieback operations.
6.1.2 The oil (gas) production process system includes: oil (gas) treatment, produced oil water processing, natural gas and associated gas processing, chemical injection, gas lift, water injection and artificial lift equipment, metering system for individual well and the related connection pipings installed on the platform.
6.1.3 All equipment used in the drilling system and oil (gas) production process system must be available with qualified ex-factory qualification certificates or equipment certificates issued by the related certifying authority. The platform operator shall identify, in accordance with the applied specifications and standards and the importance of equipment, the equipment requiring ex-works tests.
6.2` Drilling System
6.2.1 The hazardous zones for drilling, cementing, logging, completion and work-over operations shall be classified with the related provisions of Item 2.3.6 in this of the 〈Rules〉.
The electric appliances of the drilling system located in hazardous zones shall comply with the related provisions of chapter 9 of the Rules.
6.2.2 Well kick monitoring devices
On the platform, following items (at least) should be monitored:
6.2.2.1 Variations in active mud volume for cycling and mud level in the mud pit;
Natural gas;
6.2.2.3 Total mud gas volume and upward velocity;
6.2.2.4 Density of mud-in.
6.2.2.5 Density of mud-out.
6.2.2.6 Level change in the mud tank after trips.
6.2.3 Well control equipment
The well control equipment of the platform include: blow-out preventer stack, diverter, and control system for blowout
您可能关注的文档
- bx-cuwrf高中数学必修知识点.doc
- Bvlgari宝格丽BZERO系列K玫瑰金配白色精密陶瓷项坠大道网折出售.doc
- B于实践构建阶段性适用型数字化校园.doc
- BWBWSCWVW-operationmanualcn.doc
- B单相多功能台通用技术协议.doc
- b复数代数形式的则运算.doc
- B复杂条件下的锚杆支护技术.doc
- B中原子变元任意组真值指派.doc
- B企业理财之道.doc
- B整式的加减部分.doc
- ChapterComputerTechnologyReading.doc
- ChapterExampleProblemsoverheads.doc
- Chapterexerciseandtest.doc
- ChapterExercisesPARTONE.doc
- ChapterFive语义学.doc
- ChapterGeneralInformation(done).doc
- chaptergeographyandpeople.doc
- ChapterIceandRainProtection.doc
- CHAPTERFuturesandOptionsonForeignExchange.doc
- ChapterInstructorsGuide.doc
最近下载
- 文献检索与毕业论文写作全套教学课件.pptx
- 施工机械进场安全检查验收旋挖钻机).pptx VIP
- 2024年甘肃甘南州专业化管理村党组织书记迭部县招聘笔试参考题库附带答案详解.pdf VIP
- 克拉斯收割机培训资料.pdf VIP
- 《研学旅行指导师实务》课件——第3章 研学旅行课程设计.pptx VIP
- 人教版八年级英语下册Unit 7补全对话和语法综合专练(含答案).doc VIP
- 餐饮服务食品安全操作规范试题 .pdf VIP
- 氢气露点仪HMT360中文说明书.docx
- 2025广东阳江市水务集团有限公司招聘专业技术和基层一线岗位人员24人备考题库及答案解析.docx VIP
- 2024年甘肃平凉市专业化管理村党组织书记崆峒区招聘笔试参考题库附带答案详解.pdf VIP
文档评论(0)