- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
euphemism委婉的词语(euphem讲话ism讲好话)
5.3.1Is perpendicular to transport The perpendicular conveyance has already made an arrangement in 《construction deployment 》 . 5.3.2Scaffold engineering The scaffold 10 F out of this engineering part of adoption Φs 48 steel pipes take a pair of rows to hang to pick.(is detailed to see attach diagram)Sign a pole to leave a wall 35 cms, the horizontal is apart from a 1.2 ms and lengthways signs a pole to be apart from a 1.5 cms and treads Gao 1.8 ms, the small horizontal pole is apart from a 1.0 ms and connect wall pole water The even distance is smaller than a 10 ms, Shu to be apart from a 3.6 ms(two), the operation layer establishes to kick sole and the 0.9 m Gao Hu Shens column.Corpus The stage adoption dismantles a low layer the way that takes key figures and repairs a stage to then dismantle key figures to take a low layer. 6 F part takes to establish a steel pipe double outside the row.Inside repair to adopt an easy and convenient tool type a scaffold. 5.3.3Template engineering 1.Post template:The pillar pays before the mold and cleans off pillar bottom first and flick a frame open side line.The pillar mold adoption steel pipe makes Pillar hoop, the pillar hoop is apart from to be no bigger than a 500 mms and follow another Gao and pillar hoop to shunt together flat iron of constitution to pull a piece, connect with the Luo pillar Answer.(is detailed to see attach diagram)Lines up a post to pack a both ends pillar mold first while installing a pillar mold, after correcting fixedly, pull a line to correct in the center Pillar mold.The pillar is higher big than a 4 ms, should establish to flap a Dao in the pillar.A noodles beard of pillar mold root establishes to be no smaller than 200 mm height Of clean up a miscellaneous articles or objects, need the miscellaneous articles or objects inside the mold cleaning off pillar before sprinkling Dao concrete to make whole with the template behind. 2.beam mold:the beam is higher big than a 700 mms, the side mold central
您可能关注的文档
最近下载
- 2021版35kV~750kV 变电站通用设备技术规范第13部分:接地变压器及消弧线圈成套装置.pdf VIP
- 心脏横纹肌瘤的科普知识课件.pptx VIP
- 2021版35kV~750kV 变电站通用设备技术要求及接口规范第2部分:高压并联电抗器.pdf VIP
- 新概念英语二册Mp3教程附音频下载-英语听力_0.pdf VIP
- 2021版35kV~750kV 变电站通用设备技术规范第9部分:低压并联电抗器.pdf VIP
- 2021版35kV~750kV 变电站通用设备技术规范第第12部分:站用变压器.pdf VIP
- 初一有理数计算700题.docx VIP
- 市政供热管网施工技术的方案.doc
- 循环教材制度_使用登 记表.doc VIP
- 部编小学语文六年级上册第二单元《革命岁月》集体备课教材分析解读.pptx VIP
文档评论(0)