overcrowdeda.挤满的(overcrowded拥挤的).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
overcrowdeda.挤满的(overcrowded拥挤的)

radicle pit time fills, have to clean up The foundation bottom noodles elevation, clears the lax miscellaneous articles or objectses, such as garbage, sand syrup and pebble...etc. dropped clean. Examinations returning to the quality of filling the soil has already had no miscellaneous articles or objects, whether grain path meets rules, and returns to fill containing of soil whether amount of water In the scope of the control;If containing amount of water is higher, can adopt to turn over loose, sun or even add to do measures like soil,etc;Such as Meeting a time to fill the containing of soil amount of water is low, can adopt to in advance sprinkle water smooth wet etc. measure. Return to fill the soil spreads in response to the layering stand.Each thickness that fill soil should request according to the soil quality, airtight solid degree with machine tool function to make sure. The general breast-stroke swimming beats popular machine each one to spread soil thickness is 200~250 mms. Return to fill at least the soil each one Be popular to beat 3 times.Beat popular should a popular press half popular, popular connect, go connect with each other, maneuver Cross. Return to fill the soil each one to fill soil popular actually after, should carry on a wreath knife sampling according to the norm, test to find out the quality of doing the soil airtight solid;Reach To after requesting, carry on spreading of 1 F again soil.The foundation connects beam mat layer bottom, the soil layer beard clears 400 thick, 600 breadths, With the medium coarse sand time fill to flap actually, press solid coefficient 0.95. Fix whole seek even:Should carrying on surface wire drawing to seek after filling soil all a completion is even, any place that exceeds standard Gao Cheng, And enter to root out according to line;Any is lower than standard Gao Chengs place, should repair soil popular solid. (Four)Reinforcing bar engineering 1.all reinforcing bars all press diagram paper and norm to request

文档评论(0)

xcs88858 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档