桥墩混凝土外观质量观摩会汇报资料(二项目部)(The concrete quality of pier concrete will be reported (two project department)).docVIP

桥墩混凝土外观质量观摩会汇报资料(二项目部)(The concrete quality of pier concrete will be reported (two project department)).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥墩混凝土外观质量观摩会汇报资料(二项目部)(The concrete quality of pier concrete will be reported (two project department))

桥墩混凝土外观质量观摩会汇报资料(二项目部)(The concrete quality of pier concrete will be reported (two project department)) The appearance quality of concrete bridge will observe the reported data (project two).Txt25 love is a lamp, the darkness of walking distance; love is a poem, a cold heart warm.; love is the wind in summer, is the sun in winter, is the spring rain, autumn fruit. This article is contributed by yangtig DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Pier, concrete appearance quality, exchange meeting, pier concrete appearance quality, exchange meeting, concrete appearance quality exchange meeting I. General Situation of the project China Railway two bureau, long Xiamen railway, LX - III standard project headquarters second project department, undertake the long Xiamen Railway 14 large and medium-sized bridges construction, in which the Longyan super bridge and the Lower East Grand Bridge for the entire line of key control works. 1, Longyan bridge of Longyan bridge is located in Longyan City, mileage DK4+039.205 starting point, end point mileage DK5+823.31, crossing the Zhanglong railway, North Ring Road, Dongxing Road, longjinhe, climbing Road, Longyan east station throat area, South Loop and other existing railway, river and city road. Full bridge 1784.1m long pile foundation for 506, a total of 45 0#, 45# Taiwan pier, with a rectangular solid table, the rest are all round - shaped solid pier, the pier height is 4.9~34 meters. Beam: full bridge span is 1 24m * +2 * 32m+1 * 24m+4 * 32+ (32+48+32) m continuous beam + 6 * 32m+ (48+4 * 80+48) m continuous beam +1 (32+48+32) m * 24m+ * 24m+6 * +2 continuous beam 32m+ (60+100+60) m +6 * 32m continuous beam. 2, Dongshan bridge general Dongshan bridge start mileage DK9+421.28 ~ DK11+645.78, the center distance DK10+533.53. Full-length L=2224.5m. A total of 789 full bridge pile foundation, pier 68; 0#, 67# is a rectangula

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档