桥梁钻孔灌注桩施工工程实例(Construction example of bridge bored pile).docVIP

桥梁钻孔灌注桩施工工程实例(Construction example of bridge bored pile).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥梁钻孔灌注桩施工工程实例(Construction example of bridge bored pile)

桥梁钻孔灌注桩施工工程实例(Construction example of bridge bored pile) Combined with the construction example of bored pile in bridge, the common causes of broken pile are analyzed, and the treatment method after broken pile is introduced. With the rapid development of Chinas transportation infrastructure construction, bored pile is a basic form for its simple construction, strong adaptability, moderate cost etc., foundation construction has been widely used in highway bridges and other engineering fields in. But because the bored pile is a concealed project, if there is any carelessness or omission in the construction, the quality accident of the cast-in-place pile and the broken pile will appear. A brief analysis of the causes of broken pile is made, and some technical methods for dealing with the broken pile are introduced. Analysis of the causes of 1. broken piles (1) in the process of pouring concrete, the surface elevation of concrete has been measured, which leads to the too small buried depth of the pipe, the phenomenon of uplift and leakage, and the formation of interlayer broken pile. Especially in the later stage of bored pile, when the overpressure is too small or the instrument is not accurate, it is easy to mistake the mixed soil layer in the mud as the surface of the concrete. (2) in the process of pouring pipe buried depth is too large, too long, at the beginning of the concrete pouring concrete caused by excessive liquidity has been reduced, thereby increasing the friction force of concrete and tube wall, in the promotion of connecting bolt breaking or duct rupture and broken pile. (3) due to the randomness of artificial ingredients and poor sense of responsibility, the error of concrete mixture ratio in the course of the implementation is great, so that the slump fluctuates greatly, mixing the mixture when it is thin and dry. Slump is too large will have the coarse aggregate segregation phenomenon, squeezing catheter obstruction; slump is too small or too long p

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档