桥式起重机(Bridge crane).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥式起重机(Bridge crane)

桥式起重机(Bridge crane) Test report of safety personnel of hoisting machinery Name: unit: achievement: A choice (please correct answer letters in the brackets, every day 2 points, a total of 20 points) 1, the weight is generally used () to indicate. A, G, B, Q, C, D 2, the reverse deformation of the hook exceeds () 0, should be scrapped. A, 5 B, 10 C, 15 3, pulley groove wall thickness of wear to the original wall thickness (%), pulley scrapped. A, 10 B, 20 C, 30 4. The motor used in the hoist can not be used below the rated value of the supply voltage below%. A, 70 B, 80 C, 90 5 、 master command controller is mainly used for (or) motor or heavy duty and frequent starting occasions (such as grab operation). A, large capacity B, Rao line C, squirrel cage type 6 、 when the crane boom extends, the amplitude varies. A, big B, small C, unchanged 7, elevators, elevator is according to the classification of (). A, according to whether there is no driver B, according to the use of C, according to the mode of operation 8, fishing hook under what circumstances should be scrapped () A, dangerous section wear up to the original size of 5% B, dangerous section wear up to the original size of 10% C, dangerous section wear up to 8% of the original size 9. Prolong the service life of wire rope, lubricate the wire rope periodically, once every (). A, 150 hours B, 160 hours C, 170 hours 10. Cranes operating on rails shall anchor the crane when the work is done. When the wind is greater than () level, the general should stop working. A, class 5, B, class 6, C, class Two, determine the title (the correct tick wrong hit X , every day 2 points, a total of 20 points) 1, fuse can only do short-circuit protection, can not do overload protection. () 2. The motor used in the hoist crane can be used below 90% of the rated voltage of the power supply. () 3, usually crane electrical appliances are good insulation, not leakage. () 4, the hook opening than the original size increased by 15%, the hook

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档