analysis of the shougang-owned power plant boiler-turbine control system and improvement of the status quo(boiler-turbine shougang-owned电厂控制系统的分析和改善现状).docVIP
- 1、本文档共21页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
analysis of the shougang-owned power plant boiler-turbine control system and improvement of the status quo(boiler-turbine shougang-owned电厂控制系统的分析和改善现状)
Analysis of the Shougang-owned power plant boiler-turbine control system and improvement of the status quo
Paper Keywords: captive power plant, boiler-turbine control system, the status quo, improvements
Abstract: This paper outlines the thermal power plant automation technology, new development, analysis of the Shougang-owned power plant boiler-turbine control system status, including: the main process equipment; size and boiler-turbine control system commissioning, system structure and main features. and proposed captive power plant of Shougang boiler-turbine control system to improve and perfect views.
1 Introduction
Shougang since 1986, large-scale application in captive power plant to N-90, represented by IX Wan Distributed process control equipment, the boiler-turbine manufacturing operations management full control in the domestic 50 000 kW thermal power unit made the automatic control important breakthrough, is the small and medium units in the full application of computer-controlled first success from the first production unit has three generating units one after another 10.4 billion degrees, not only long return on investment, and create profits by 20 billion, led by Steel’s reform and development has created enormous benefits. learn from the advanced technology, carefully analyzed Shougang 50,000 kW thermal power application of computer network control unit lessons, made of small units in the control of how deep in the development and utilization of new generation of advanced features of the DCS for the improvement of Shougang-owned power plant to further improve the automatic control system, to obtain greater economic benefits, there is a very important practical significance.
2 thermal power plant of the new development of automation technology
In recent years, the development of high-parameter, high-capacity power unit to speed up construction of power speed and reduce coal consumption is a trend at home and abroad, while 80 years, du
您可能关注的文档
- analysis of the new curriculum reform in the context of classroom teaching and cultural analysis(分析新课程改革背景下的课堂教学和文化分析).doc
- analysis of the new curriculum standards in the top problem(新课程标准的分析问题).doc
- analysis of the new curriculum review and outlook(分析新课程的回顾和展望).doc
- analysis of the new curriculum teaching of chinese language and literature the concept of change(分析新课程语文教学的概念改变).doc
- analysis of the new curriculum teaching reform _ writing papers network requirements of secondary school language teachers(新课程教学改革的分析_写论文中学语言教师的网络需求).doc
- analysis of the new curriculum the context of vocational health education(分析新课程背景下的职业健康教育).doc
- analysis of the new curriculum standards high school physical education and health curriculum choices(分析新课程高中体育与健康课程标准的选择).doc
- analysis of the new development of physical education(分析体育教育的新发展).doc
- analysis of the new curriculum under the concept of teaching strategies(分析新课程理念下的教学策略).doc
- analysis of the new curriculum reform of rural life teaching elementary mathematics(分析农村生活的新课程改革小学数学教学).doc
- 预应力筋用锚具、夹具和连接器应用技术规程 JGJ 85-2010 知识培训.pptx
- 多联机空调系统工程技术规程 JGJ 174-2010 知识培训.pptx
- 2025届山西晋中学市榆次区中考冲刺卷历史试题含解析.doc
- 钢管满堂支架预压技术规程 JGJ_T 194-2009 知识培训.pptx
- 河北省唐山市古治区2025届中考历史模拟试卷含解析.doc
- 建筑桩基技术规范 JGJ 94-2008知识培训.pptx
- 普通混凝土用砂、石质量及检验方法标准培训.pptx
- 建筑施工作业劳动防护用品配备及使用标准 JGJ 184-2009知识培训.pptx
- 城市轨道交通引起建筑物振动与二次辐射噪声限值及其测量方法标准 JGJ_T 170-2009知识培训.pptx
- 岩溶地区建筑地基基础技术规范 DBJ_T 15-136-2018 知识培训.pptx
最近下载
- 2023年湖南工业大学软件工程专业《计算机组成原理》科目期末试卷B(有答案).docx VIP
- 2023年天津工业大学数据科学与大数据技术专业《操作系统》科目期末试卷A(有答案).docx VIP
- 2023年湖南工业大学软件工程专业《计算机组成原理》科目期末试卷A(有答案).docx VIP
- 数据隐私保护合规指南.docx VIP
- 《围城》读书分享PPT--讲稿.docx VIP
- 2025北京大兴区安定镇人民政府委托招聘21人笔试备考试题及答案解析.docx VIP
- 四年级下册语文试题-期末课外阅读专项测试卷 (含答案)人教统编版8.pdf VIP
- 2023年天津工业大学数据科学与大数据技术专业《操作系统》科目期末试卷B(有答案).docx VIP
- 语文写作能力培养的有效方法研究教学研究课题报告.docx
- 基于PLC的燃气供应系统设计.doc
文档评论(0)