1砖砌体施工技术交底(1 brick masonry construction technical disclosure).docVIP

1砖砌体施工技术交底(1 brick masonry construction technical disclosure).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
1砖砌体施工技术交底(1 brick masonry construction technical disclosure)

1砖砌体施工技术交底(1 brick masonry construction technical disclosure) First, according to. 1, design drawings, drawings and related documents. 2, the current specification. Two, engineering lofting graph See the related outpatient building building plans. Three, technical data 1, following the elevation of -0.05m part of the MU10 M5 cement mortar masonry brick machine, no foundation beam, the elevation of -0.05m 20 1:2 thick cement mortar (cement weight 5% in a waterproof moisture-proof layer). 2, frame filled wall: (1), in addition to figure stated, on the use of 240 MU5 thick hollow clay brick, with M5 cement lime mixed mortar masonry, inner wall with 180 MU5 thick clay hollow brick, cement lime mortar mixed with M5. (2), in addition to figure stated, with 240 MU7.5 thick clay brick parapet, M5 cement mortar. (3), in addition to figure stated, 120 thick brick wall with MU7.5 clay brick, cement mortar M5. (4), in addition to map stated, elevator hoistway wall thickness to 240 common sintered clay brick. 3, structural column: (1), when the wall thickness is not less than 180 and the length of more than 5 meters, or when the wall thickness is less than 180 and the length of more than 4 meters, are required to set up a structural column in middle and end wall wall junction. (2) every 3~4 meters, roof parapet wall hanging structure column; end column. (3), the C20 of cast-in-place concrete structure column. (4), concrete wall, column and column structure are set and the wall reinforcement Rachel connection. Four, process Copy flat line pendulum brick vertical pole brick mortar cleaning skin Five, the quality standard of ordinary brick masonry 1, the main control project (1), the strength grade of brick and mortar must meet the design requirements. (2) the level of mortar masonry mortar joint plumpness shall not be less than 80%. The number of sampling inspection: each batch of checks should not be less than 5. Test method: 100 grid check and the bottom surface of the brick mor

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档