07建设工程管理与实务(07 construction project management and Practice).docVIP

07建设工程管理与实务(07 construction project management and Practice).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
07建设工程管理与实务(07 construction project management and Practice)

07建设工程管理与实务(07 construction project management and Practice) 1. a project consists of two sub projects, contract a B is 200 yuan /m3, 180 yuan /m3, and from the first month, according to the proportion of 5% buckle warranty gold, other engineers issued monthly payment minimum amount of 250 thousand yuan. The contractor is the first month of actual completion and approval by the engineer of the A and B two of the engineering quantity is 700m3 and 500m3 respectively, the month of engineering quantity price (A). A.23 million B.21.85 million C.22.6 million D.25 million 2. bidders if that project quantity list is missing, must pass (B) by way of listing as a unified change. A. notice B. questioned C. ask D. request 3. investment in the project proposal and feasibility study stage of the preparation of construction projects can be estimated according to (C). A. fixed budget B. budget quota C. investment evaluation index D. estimate index 4. in a single code spliced network planning (D), logical relation, there is overlap relationship between the work. A. node B. number C. line D. arrow Before the 5. hypothesis C tight for A, B, A, B two if the work of the earliest start time is 6 days and 7 days, the duration is 4 days and 5 days, the earliest start time for the work of C (C). A.10 day B.11 day C.12 day D.13 day Answer: A B C D C In 1. the construction cost control in the process (C) is the core of construction cost control work. A. forecast B. check C. analysis D. correction 2. numerical similar indicators in different periods were compared to calculated ratio, cost analysis method analysis the development direction and speed of this index is (D). A. ratio method Ratio method B. C. static ratio method D. dynamic ratio method The analysis is based on the annual cost of 3. (A). A. annual cost report B. progress report C. cost budget The actual cost of D. Engineering change occurred in 4. of a project in the construction process, a similar change the price of engineering co

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档