市政清单道路计算规则(The list of municipal road calculation rules).docVIP

市政清单道路计算规则(The list of municipal road calculation rules).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政清单道路计算规则(The list of municipal road calculation rules)

市政清单道路计算规则(The list of municipal road calculation rules) road engineering Explain I. General description (1) the quota of road works shall be applied to roads, plazas and other municipal works, factories and living quarters within the limits of towns, such as newly-built, expanded or rebuilt cities and towns. (two) the road base quota of earthwork are compaction, not less than 500m valuation, including transportation, 500m earth, implementation of earthwork increase fixed distance. Two, subgrade treatment instructions (1) dynamic consolidation of foundations means operation on natural foundations or on filled foundations. The quota does not include the cost of dynamic consolidation before the dynamic compaction, such as design requirements, test tamping and other calculations. (two) the foundation shall be filled with foreign soil (stone), and the other shall be carried out according to the corresponding project. (three) the number of strikes per time means the number of successive strikes of the tamping machine at one point without displacement. When all tamping points in the area of the ram are completed, that is to complete the tamping; if it needs to be rammed again, the corresponding item shall be applied again according to the number of times of tamping. (four) the implementation of the low hammer tamping tamping energy is less than or equal to 1200kN - m, 2 - point / project. (five) the road shoulder and sidewalk rolling rolling, plastic artificial digging quota including the average thickness of which is less than 10cm, low level of high fill roadbed, so as to form the design requirements of the vertical and horizontal slope, and the heavy roller compacted, meet the design requirements. (six) the blind channel quota of subgrade does not include the abandonment and transportation of earthwork, and the abandonment and transportation of earthwork shall be calculated according to the corresponding projects of earthwork and stonework. (seven) the old pavement chi

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档