- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工10秋《建筑施工》在线作业2(Big work 10 autumn construction work online homework 2)
大工10秋《建筑施工》在线作业2(Big work 10 autumn construction work online homework 2)
Big work 10 autumn construction work online homework 2
First, radio questions (15 questions, 60 points) Score: 0
V
1. the strength of mortar is the cube test block with the side length of (mm), under the standard curing, the average compressive strength after (or) the age.
A. 50,14
B. 35,28
C. 60.8,21
D. 70.7,28
The correct answer: D Full Score: 4 points: 0
2. sliding formwork, the height of the formwork depends on the speed of sliding and the time required for the concrete to reach the strength of the die, and generally take () M.
A. 0.6~0.8
B. 0.8~1.0
C. 1.0~1.2
D. 1.2~1.4
The correct answer: C Full Score: 4 points: 0
3. the following preparations should not be made before concrete pouring is done.
A. good acceptance of concealed works
B. cleans mud and debris
C. apply moisture to dry cohesive soil
D. do vibrating compaction work
The correct answer: D full marks: 4 points: 4, site construction, brick wall daily height should not exceed () m; rainy days of construction, the daily masonry height should not exceed () M.
A. 1.4,1.6
B. 1.6,1.4
C. 1.2,1.8
D. 1.8,1.2
The correct answer: D Full Score: 4 points: 0
5. brick masonry, brick should be early () watering wet, so as not to brick excessive absorption of moisture in the mortar, and affect its bonding force.
A. 24 hours
B. 36 hours
C. 1~2 days
D. 3~4 days
The correct answer: C Full Score: 4 points: 0
6. the lifting height of the Longmen frame is generally () m, and the lifting weight is () t.
A. 15~30,0.6~1.0
B. 15~30,0.6~1.2
C. 20~30,0.8~1.0
D. 20~30,0.8~1.2
The correct answer: B Full Score: 4 points: 0
7. sintered common bricks are solid or porosity bricks made of clay, rock sheets, coal, stone and fly ash as raw materials.
A. is not greater than 15%
B. no less than 15%
C. is not greater than 12%
D. no less than 12%
The correct answer: A Full Score: 4 points: 0
8. the determination of water retention capacity of mortar is expressed by the deg
您可能关注的文档
- 团队合作精彩小故事(Team work, wonderful little stories).doc
- 团队建立的五个发展阶段(Five stages of development of a team).doc
- 团队合作故事(Teamwork story).doc
- 团队建设中的叶公好龙现象(The construction of the team in yegonghaolong phenomenon).doc
- 团队建设方案(Team building program).doc
- 团队建设的12C法则(The 12C rule of team building).doc
- 团队名称和口号(Team name and slogan).doc
- 团队建设的四戒(Four precepts of team building).doc
- 团队学习对绩效具有积极的影响作用(Team learning has a positive effect on Performance).doc
- 团队描述(Team description).doc
- 2025年吉他演奏技能测试题目及答案.doc
- 2024-2025学年度地铁职业技能鉴定自我提分评估(网校专用)附答案详解.docx
- 2024-2025学年度地铁职业技能鉴定自我提分评估(考点精练)附答案详解.docx
- 2024-2025学年度地铁职业技能鉴定自我提分评估(突破训练)附答案详解.docx
- 2024-2025学年度地铁职业技能鉴定自我提分评估(考点梳理)附答案详解.docx
- 2024-2025学年度地铁职业技能鉴定自我提分评估(基础题)附答案详解.docx
- 健康管理公司技术人员培训合同.docx
- 2025年吉利shl性格测试题及答案详解.doc
- 2024-2025学年度地铁职业技能鉴定自我提分评估附答案详解(黄金题型).docx
- 健康管理公司技术人员招聘合同.docx
文档评论(0)