- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
彩钢板施工计划(国外英文资料)
彩钢板施工方案(国外英文资料)
The construction plan
Kunshan co., LTD
Clean room maintenance partition construction plan
The construction plan of the top system of the clean metal wall of the kunshan codory metal co., LTD.
? MAX CC - C alloy dark keel system
It is convenient to install the top keel series, and it is very widely used for hanging hanging system. The ceiling has a stronger ability to fight the impact load.
This keel system is not visible in the clean room, clean indoor roof is smooth and clean, facilitate clean, do not collect dust. Comply with the requirements of GMP.
? 50 pairs of magnesium-magnesia roof slab construction plan:
The layout of the roof panel of the secondary layout is arranged on the floor
B. typesetting figure according to the roof and floor panel and roof line position, level or vertical, to reflect to the environment at the top of the hoisting position on the top of the civil, the expansion bolt is fixed at the top of the building, coupling nut expansion screws and screw connection and fixed screw reserved length depending on civil top and clean room room level. (in case of the steel structure plant roof, can be used with tiger head clamp)
C. the spline should be placed in the width of the ceiling, and the distance of the lifting point is about 1200mm
D. the screw is connected to the square regulator with a nut, and the T bolt is connected to the upper beam
E. the ceiling girder is installed in the width direction of the top plate (the top plate length direction is installed in the aluminum), and after the installation of the roof girder, the horizontal adjustment is made
F. roof installation, use drlling tapping screw install condole top plate fixed on the ceiling girder, when you have met with civil post or steel roof structure object collision conflict, cutting roof and by choi steel since the fold a hole.
? 100mm thick inner wall panel construction plan:
A. pay-off: first, ground leveling and sundry cleaning, according to the second floor pla
您可能关注的文档
最近下载
- 《产品质量鉴定程序规范 总则》.pdf VIP
- 沪科版九年级物理公式复习.pdf VIP
- AQ∕T 2063-2018 金属非金属露天矿山高陡边坡安全监测技术规范(可复制版).pdf
- 高速公路无人机自动巡检可行性探究.pdf VIP
- CR4012022机器人CR认证可靠性等级认证实施细则.pdf
- 再生水管道阀门选型与管理.doc VIP
- 某公司办公区生活区消防检查记录表.docx VIP
- 人教版高一数学必修一练习题-高一数学人教版必修一《集合》练习题3.doc VIP
- 智慧方案光储充一体化系统解决方案.pptx VIP
- IPC-TM-650测试方法手册CN2020必威体育精装版(104个方法)扫描版.pdf VIP
文档评论(0)