- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地热施工后的豆石混凝土回填(国外英文资料)
地暖施工后的豆石混凝土回填(国外英文资料)
The concrete backfill after construction of ground heating
?
At the end of the floor heating construction is pisolite concrete backfill, floor heating system is installed, suppression test by party a and party b after the acceptance of common, can be laid pisolite concrete.
Suppress the test method: when all circuits of a branch are installed, the test is suppressed. Open the diversity of water valve for water loop, the diversity of water mouth with water, water supply of each loop pipe filled with water and stable, close the diversity of water return valve, the diversity of water installation for recharging drawdown pressure gauge, water pressure test, the test pressure should not be less than 0.6 Mpa. When test pressure is 0.6 Mpa, observe the pressure gauge, when the pressure gauge to keep this value reaches an hour or an hour of pressure drop is less than 0.05 Mpa, show that pavement line is normal. For a freeze on construction in stages should be taken under the circumstance of suppression test, the first stage, after the outfit in heating tube, crackdown test, this phase should keep to the heating of the heat protective layer are completed, then blow dry heating tube of water blowing off; In the second phase, after the floor decoration layer was installed, the experiment was repeated and the water in the tube was blown away.
Each floor heating construction area laying is completed, party a shall arrange pisolite concrete cover of backfill work, backfill should be able to fully cover the thickness of floor heating pipes, if cannot promptly backfill layer should be objective, should be to isolate area, other irrelevant personnel shall not enter.
After the floor heating and decoration layer is finished, the ground is not to be drilled, perforate and cut the ground.
The pavement of the concrete protection layer of ground heating bean stone:
(1). Material requirements
The cement: the use of Pc32.5 cement.
Sand: medium sand or coarse sand, not
您可能关注的文档
- 2007年度临安市村饮用水义务总结)(国外英文资料).doc
- 2009年家当园区消防义务总结(国外英文资料).doc
- 2013年印度宝马展(国外英文资料).doc
- 2013年进网电工续期(高压)部分考题A(国外英文资料).doc
- 2014年新版修建天资标准——水利水电工程施工总承包(国外英文资料).doc
- 2014广东佛山市中考《珠江文明的不朽灯塔》扫瞄谜底(国外英文资料).doc
- 2014年9月份测验桥梁工程第一次功课(国外英文资料).doc
- 2014秋东财《成本司帐B》在线功课二(国外英文资料).doc
- 2015-2016厦门大学土力学与地基基础(国外英文资料).doc
- 2011年高考理综谜底(全国卷)(国外英文资料).doc
文档评论(0)