- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011年高考理综谜底(全国卷)(国外英文资料)
2011年高考理综答案(全国卷)(国外英文资料)
In the morning, we mainly watch jiangdu 237 national road box girder, the bridge length 415.634 m, located in a village in jiangdu city. The whole bridge is located in a curve, by 8 x 32 m prestressed concrete whole prestressed reinforced concrete box girder + 1 x 24 the whole box girder + 1 x 32 m cast-in-situ prestressed reinforced concrete whole + 1 x 80 m steel box girder truss of combination beam.
And mainly responsible for the manual construction process and the process. A lot of knowledge and principle is often the key to solving the problem. Second, through this graduation internship, I was more aware of the importance of construction management. Whether engaged in design or construction or supervision, we should focus on improving the efficiency of construction management. The two engineering units of this graduation internship, their advanced management ideas and methods are worth studying. Especially in fujian shuangyong high speed project internship, give me the feeling the most profound.
Box girder design for prestressed concrete simply supported box girder single box single room, 8 box girder is 13.4 m, 32.5 m long, liang across part of the beam is 2.8 m high, in the fulcrum section beam is 3.0 m high, cross the bridge to the bearing center distance 4.7 m; A total of 315.2 m3, box girder concrete cast-in-place beam using the anchor wire drawing system, the standard strength FPK = 1860 mpa, prestressed pipe using corrugated tube into the hole, anchor the OVM15-12, 13 OVM15 - two; Prestressing tensioning should be performed when the concrete strength reaches 100%. Tension according to the order of the steel beam number when tensioning, dual control, the tension stress and elongation stress is given priority to, after the completion of the tensioning with 40 cement grouting.
Road bridge construction management should consider the content much, the scope is wide,Therefore, it is difficult to transfer the knowledge from the experie
文档评论(0)