声樊篱主要类型及施工计划(国外英文资料).docVIP

声樊篱主要类型及施工计划(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
声樊篱主要类型及施工计划(国外英文资料)

声屏障主要类型及施工方案(国外英文资料) (2) surface cleaning process: use compressed air to blow out the flour grains with clean, clean cotton yarn and rags to prevent recontamination. (3) the surface cleaning of the steel shall conform to the tender documents and relevant regulations. 3, sandblasting in addition to embroider (1) the outside surface of the steel component is applied to the abrasive blasting before the coating is applied, and the interior can be polished by the pneumatic tool. (2) the site shall be embroidered at the site of the site, and the damaged parts of the site shall be emblazoned with pneumatic tools. (3) to meet the requirements of the relevant regulations in addition to the level of embroidery. In addition to the embroidery, the surface of the steel surface should be cleaned and cleaned. Coating process and technology (1) the application of painting is high-pressure and airless spray pump construction, according to the selected paint performance and the right choice of the spray gun air pressure. (2) it is impossible to do outdoor coating on rainy days. (3) the surface of the coating should be smooth, flat, no needle hole and clear flow, wrinkling skin, leakage and other maladies, the surface paint should be clean and beautiful, and the color is even. (4) the film thickness meets the requirement, the minimum film thickness is above 85% of the specified thickness, but not blindly. (5) for difficult parts such as the edge of freedom, the brush should be painted one or two times before high-pressure air spraying. (6) after the last line of the paint job in the decoration, and correct shortcomings, after seriously do a good job cleaning before coating, should pay attention to the relevant parts when spraying under protection. (7) the coating shall be under the thickness of the coating, and the thickness of the coating shall be examined and recorded. The quality of the paint film shall be inspected by visual inspection, and the specific paints shall be in accorda

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档