- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
墩柱足手架施工计划(国外英文资料)
墩柱脚手架施工方案(国外英文资料)
It is important to adopt a stable and reliable method of padding, and no more than 0.5 M. When more than 0.5 M, the floor of the shelf should be raised according to the set rules. In the case of elevation of the enterprise, the protective measures shall be increased accordingly. (8) when carrying the material on the shelf, it should be sent out in time to please note the please make a let signal. The material shall be laid on a low shelf, and shall not be used in the manner of falling, hurrying or other hastily discharging materials; (9) the fence is not less than 1.2 meters high, and it is needed to set up the board or guard net.
The demolition of the scaffold
(1) the danger of the demolition of the work is greater than that of the assignment. Before disassembling, establish a unified command and provide technical safety to the operator to ensure the safety of the demolition operation is carried out smoothly.
(2) must be in after the first of, outside before, after the first plane surface material frame materials, auxiliary parts before the order of the structure, a remove a loose coupling, and then the crane under (or concentrated to the adjacent to the surface of the rack is not opened, strapping condole) after.
(3) to remove the foot pallet, bar, door frame, and other parts that are longer, heavier and have two ends, must be carried out by two or more persons. When the horizontal bar is removed, the connection is loosened and the horizontal holder is removed. When the pole is removed, it is secured to the top and then unconnected.
(4) avoid the removal of a single person. In the case of one-man homework, accidents can be caused by the instability and imbalance of the control rod.
(5) when a large number of people or groups are disassembled, they shall strengthen the command and ask and coordinate the procedure of the operation, and strictly prohibit any disassembly without the procedure.
(6) when the shelf is unstable because of the pull of th
您可能关注的文档
- 2014广东佛山市中考《珠江文明的不朽灯塔》扫瞄谜底(国外英文资料).doc
- 2014年9月份测验桥梁工程第一次功课(国外英文资料).doc
- 2014秋东财《成本司帐B》在线功课二(国外英文资料).doc
- 2015-2016厦门大学土力学与地基基础(国外英文资料).doc
- 2011年高考理综谜底(全国卷)(国外英文资料).doc
- 20万摆弄150平米大房子 测验测验后现代风格装修(图)(国外英文资料).doc
- 23第二十三节 败血症(国外英文资料).doc
- 2015新水利水电工程施工总承包天资标准(国外英文资料).doc
- 24m预应力折线屋架施工计划(国外英文资料).doc
- 2、水工修建物的分类及特色(国外英文资料).doc
最近下载
- CECS193-2005 城镇供水长距离输水管(渠)道工程技术规程.pdf VIP
- 《Python数学建模算法与应用课件》04第4章 线性规划和整数规划模型.pptx
- 立体仓库结构设计(底盘单元).docx VIP
- ASME中国制造-ISO12944-7-2017 中文译稿 第7部分 涂装工作的实施和监管.pdf VIP
- 2025年生物制药企业生产过程节能减排与成本控制方案.docx
- 民国时期广东的蔗糖生产与蔗糖业纠纷研究.pdf
- 末梢血标本采集专家共识试题及答案.doc VIP
- 年回收拆解30000辆报废汽车新建项目环境影响报告.docx VIP
- JTT1495-2024公路水运危险性较大工程安全专项施工方案审查规程.pdf VIP
- 《人类起源的演化过程》名著导读PPT教学课件.pptx VIP
文档评论(0)