场地平坦施工计划(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
场地平坦施工计划(国外英文资料)

场地平整施工方案(国外英文资料) First, the ground level construction plan The land that the project implements land to organize the project, incline is relatively gentle, there is not too big mountain pack mound and so on. Therefore, the construction is mainly bulldozer, which is used for excavating deep and deep areas. 1, preparation before construction Set up the project department, set up the project managers on-site office, and build temporary dormitory, material warehouse, and machinery space. Set up the project sign and the overall floor plan of the site. To establish the responsibilities and standards for the positions. To formulate the plan for the entry of raw materials, materials, machinery, population, etc. The company shall conduct the education, the technical background and the technical training for each position. At the same time, the construction site should be cleared, the site will be cleared and the drainage facilities are set up. To repair, maintain and maintain mechanical facilities, ensure the equipment is in good condition. 2, the construction sequence Construction, according to the principle of from high to low, according to the actual situation of the village land use the site after the demolition, measurement, alignment, and then will be divided several assignments section, the construction site and to determine the construction sequence of construction, when after the completion of the last section, withdraw on a temporary base side away from the edge of the construction method. 3, establish control network According to the coordinate and elevation provided by the construction unit and the supervising unit, the site is set up with the theodolite and the water level to ensure that the height and position are accurate. Land balance and deployment Construction, a block a block, each block to control the first four corner position and elevation, and then use mechanical and artificial earthwork balance for this block, the earthwork sinotrans or paged, earthw

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档