工程造价练习周记心得与总结(国外英文资料).docVIP

工程造价练习周记心得与总结(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程造价练习周记心得与总结(国外英文资料)

工程造价实习周记心得与总结(国外英文资料) Learning content: first understand the project summary: what channel west yanan east road tunnel exit in the pudong new area, along the direction of pudong avenue, pudong jinqiao road on the east, and with the rail transit line 14 6 station interval collinear, total length of 7.8 KM. The dragon road west is an underground road, about 6.1 KM long. Our project for the hengjing harbor bridge to luo road station this paragraph, including the hengjing harbor bridge for this blocks the key nodes, the yankees were computed.in port node for multi-level interchange traffic system, from top to bottom including: new computed.in harbor bridge, the flavour hengjing port channel, what channels underground part, line 14 shield crossing. In the afternoon, our head of security Cao Gong first gave us a lesson on la vivid security and safety assessment of knowledge, after assessment is eligible to take us to be familiar with the environment on construction sites. At the foundation pit of the luoshan road wind engine room, the elder brother explained to us the construction technology of the maintenance structure. In this paper, the principle and application of high pressure spout pile and SMW engineering pile are studied. Returning from the scene, the master explained to us the personnel, departments and functions of the project department. And asked us to first be familiar with office software, autocad, etc., to the scene, the construction organization design and construction scheme and entities corresponding to increase the perceptual knowledge. Time: on March 10 Interning: water pipes are being made up near the bridge near the pidgin bridge and are ready for intermediate channel construction. Due to owner to borrow and part of the demolition work is not as planned, our construction period delay, now can only make pipes relocation work and temporary pavement construction, to prepare for the later road turn to pay. Today, we looked at the construction of excavat

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档