大跨度钢管混凝土拱桥拱肋线形操纵技巧(国外英文资料).docVIP

大跨度钢管混凝土拱桥拱肋线形操纵技巧(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大跨度钢管混凝土拱桥拱肋线形操纵技巧(国外英文资料)

大跨度钢管混凝土拱桥拱肋线形控制技术(国外英文资料)Large span steel tube concrete arch bridge arch rib control technologyAuthor: fu chao??? Source: recommended by Internet users??? Number of hits: 34???? Update time: 2005-11-6????1, engineering overviewDrifting at jiuwanxi bridge belongs to the three gorges project supporting the project, located in the three gorges reservoir area zigui county, hubei province, total length of 221.5 m, the bridge for the net across 160 equal cross section catenary concrete-filled steel tube arch bridge bearing type, the main arch ring USES two d = 1.0 m pole, established to show the dumbbell shape, arch rib height of 2.4 m. F0 / L0 = 1/6, m = 1.495109, and the net vector height is 26.67 m. The structure of the arch is an assembly reinforced concrete hollow slab with a length of 12.66 m. The topography of the bridge is steep, cliff cliffs and no construction sites. The bridge is 216.77 m above the water level of the three gorges reservoir, which is 160m high, the bridge is in the tuyere, the wind is large and the wind can reach up to seven levels. The rocks of both sides of the strait are bare, and the rocks are well developed. Bridge main arch ring with two arch rib by horizontal, flat together as whole, arch rib center distance of 7 m, considering the bridge of the special terrain and the convenience of transportation, 15 segment of double rib arch rib is divided into integral hoisting, the heaviest section 26 t, the lightest of all disturbance paragraphs 12 t. The flange is connected by a flange with a flange.Bridge main construction method for: steel pipe processing in the factory, with 12 mmq235 steel plate and the Yangtze river to xiangxi wharf, then used car site, after half span single rib try spell and adjacent segment overall stereo spell, after using the cable hoisting system double rib cantilever. The concrete filling in the steel tube arch is pumped by the two sides of the two sides, the asymmetric method of the two sides, and the loading of the

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档