- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程项目治理模拟题(国外英文资料)
工程项目管理模拟题(国外英文资料)
Class name: project management simulation problem 1
One, fill in the blanks. (36 points, 3 points each.)
The project archives shall be compiled according to the requirements of the standardization, standardization and standardization, and must be done.
2, the construction phase of the project is the implementation of the process, and related information, records, which is formed by the construction stage can be used for the acceptance of work and provide the most direct, it is archives, can promote the engineering project management.
3, project file is mainly based on, industry and local and state regulations, combined with the actual situation of each project establishment.
In the decision-making stage of the project, the main task of the landlord is to organize and report the feasibility study of the project.
The function of the proposal of construction project is manifested in three aspects: the approval of the project proposal and the term of the project; Second, the project to approve the project may further carry out the feasibility study. Third, projects involving the use of foreign capital may be carried out only after the approval of the project.
6, the owner in the project proposal approval documents, must choose to evaluate environmental evaluation unit work immediately, otherwise, the project construction cant be accepted.
The redrawing of the completed drawings must be posted; The plan of completion is usually not less than one set of units, which shall be kept by the competent authorities or the technical archives.
8, the schedule of the project implementation analysis comparison, comparing image, intuitive graphical comparison method are: crossing figure comparison method, s-shaped curve comparison method, comparison method, banana shape curve.
According to the method of the construction cost, the way of the contract of the project is divided into: the project budget is covered by the project.
The construction contract is made up of
文档评论(0)