- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大跨房屋钢结构论文(国外英文资料)
大跨房屋钢结构论文(国外英文资料)
Then respectively by crane lifting to high altitude design position to put on hold, and indirectly each cell block between upper and lower chord and diagonal until the construction method of assembled into a whole.
Using cell block hoisting construction, due to the structure of most of the welding, assembly work is done on the ground, to improve the quality of the project, and can save most of the erection of support frame; Secondly, because of the weight of the unit and the existing lifting equipment in the field, the existing lifting equipment can be used to load the net, which is beneficial to the cost of saving. The method is easier to implement in the small and medium structure, but there is also a certain high altitude work.
(3) the mobile stenting method
There is no fixed support scaffold, the grid structure is installed on the movable support frame, and it is necessary to lay the rails or flat ground for the movement of the scaffold. The portable installation method is generally used in combination with high-altitude bulk method. Note whether the site or track of the mobile installation support frame is sufficiently flat; After stent mobile, whether the structure of installed components set several fixed temporary support, bar to spread structure internal force and displacement control node, at the same time also need to consider when support is removed the internal force of change.
(4) the overall promotion law
This means that the structure will be fully assembled on the ground and then mounted on the structural column to improve the structure. Reduce the space operation quantity, facilitate the construction management, shorten the construction period, thereby greatly saves the construction cost. But due to the completion status of construction state and construction mechanics model is different, should carry on the construction and completion of the structure of the construction of internal force and deformation of node, bearing reaction
您可能关注的文档
最近下载
- CECS193-2005 城镇供水长距离输水管(渠)道工程技术规程.pdf VIP
- 《Python数学建模算法与应用课件》04第4章 线性规划和整数规划模型.pptx
- 立体仓库结构设计(底盘单元).docx VIP
- ASME中国制造-ISO12944-7-2017 中文译稿 第7部分 涂装工作的实施和监管.pdf VIP
- 2025年生物制药企业生产过程节能减排与成本控制方案.docx
- 民国时期广东的蔗糖生产与蔗糖业纠纷研究.pdf
- 末梢血标本采集专家共识试题及答案.doc VIP
- 年回收拆解30000辆报废汽车新建项目环境影响报告.docx VIP
- JTT1495-2024公路水运危险性较大工程安全专项施工方案审查规程.pdf VIP
- 《人类起源的演化过程》名著导读PPT教学课件.pptx VIP
文档评论(0)