- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
z建筑安装工程费用项目的组成与计算
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, compared with the original values confirm the location. 6.4.4.4 lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. 6.4.4.5 high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a push-pull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed 0.02mm. To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the corresponding
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the tech
您可能关注的文档
最近下载
- 广东省建筑施工安全生产隐患识别图集(装配式建筑混凝土预制构件工程).pdf VIP
- 民用无人机驾驶执照CAAC理论考试题库(各地真题).docx VIP
- 《武经射学正宗》原文及翻译注释.docx VIP
- 医院纪检监察室工作制度岗位职责汇编.docx VIP
- 长城钢铁行业主要设备润滑要求及润滑解决方案.ppt VIP
- 古籍《射经》王琚.pdf VIP
- 部编版六上语文课程纲要 .pdf VIP
- DB32_T 4787-2024 城镇户外广告和店招标牌设施设置技术标准.docx VIP
- 2024NFPA101美国国家消防安全规范中文版.pdf VIP
- 一种松香胺聚氧乙烯醚及其制备方法与应用.pdf VIP
文档评论(0)