- 1、本文档共13页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
山东建筑大毕业设计外文文献及译文
山东建筑大学毕业设计外文文献及译文
- 1 –
外文文献:
GRAPHICAL-BASED MULTISTAGE SCHEDULING METHOD FOR RC BUILDINGS
Y. C. HUANG
Department of Construction Management, Hwa Hsia Institute of Technology and Commerce, 111 Hwa Hsin Street,Chung Ho City, Taipei Hsien, Taiwan, Republic of China
Received 13 February 2004; accepted 4 March 2005
In Taiwan, contractors are becoming specialized in certain types of construction in an increasingly competitive environment and this specialization requires some scheduling models to provide better scheduling results for each type of construction. A new practical method, Graphical-Based Multistage Scheduling Method (GMSM),for scheduling RC building superstructures is presented herein. From the analysis of characteristics and construction custom of RC buildings, four constraints, (a) down–up construction, (b) building inspection, (c) reuse of beam forms, and (d) reuse of slab forms, can be established. The GMSM is developed utilizing a graphical-based method and the concept of resource reuse, and the general form of the GMSM to be facilely implemented in any worksheet software is derived as well. The results of this study provide some quantitative information as a useful guide for scheduling RC building superstructures.
Keywords: Multistage scheduling, repetitive project, RC building, GMSM
Introduction
In Taiwan, contractors are becoming specialized in certain types of construction in an increasingly competitive environment and this specialization requires some scheduling models to provide a better scheduling for each type of construction. The majority of high-rise buildings located in urban areas in Taiwan are RC structures. It is deemed crucial for high-rise buildings that a scheduling model for this type of construction can not only increase profits but also reduce the impact on urban traffic.
Of the high-rise buildings constructed to date, the network planning technique has been commonly adopted in scheduling. The Critical Path Method (CPM) is the
您可能关注的文档
- 居住区规划术经济指标.doc
- 居住区规划环境设计.doc
- 居住区设计范.doc
- 居住区规划住宅设计-竖向设计.ppt
- 居住建筑节设计标准宣贯材料之三.doc
- 局域网组建析.ppt
- 居住建筑节设计资料4.ppt
- 居者无其屋居者有其屋-居者优其屋.ppt
- 屋面与防水程施工实训项目任务书指导书.doc
- 居住区规划住宅设计课程讲义(给学生).doc
- 2024年镁氧化物项目项目投资申请报告代可行性研究报告.docx
- 2024年儿童医院项目项目投资筹措计划书代可行性研究报告.docx
- 2024年发动机试车台项目项目投资筹措计划书代可行性研究报告.docx
- 2024年合成材料抗氧化剂项目项目投资申请报告代可行性研究报告.docx
- 2024年智能卡质检分拣机投资申请报告代可行性研究报告.docx
- 2024年导电海绵项目项目投资筹措计划书代可行性研究报告.docx
- 2024年铝电解电容器项目项目投资申请报告代可行性研究报告.docx
- 2024年高速精密轴承项目项目投资需求报告代可行性研究报告.docx
- 知识产权保护新趋势技术变革与挑战应对.pptx
- 2024年滴剂项目项目投资申请报告代可行性研究报告.docx
最近下载
- 经皮冠状动脉介入治疗指南(2025).pptx
- 2025高校教师资格证之高等教育学题库(培优a卷).docx VIP
- 机械原理带传动教程课件.ppt VIP
- 医疗机构内同一检验项目在不同检测系统上可比性的验证 医疗机构内同一检验项目在不同检测系统上可比性的验证.pptx VIP
- 高校教师资格证之高等教育学题库(全优).docx VIP
- 《城镇供水定价成本监审办法》全文.pdf VIP
- 全球数字经济白皮书(202401)-CAICT.pdf VIP
- 全球数字经济白皮书(2025年).pdf VIP
- 结构化学期末复习试题15套.pdf VIP
- SY/T 6610-2017 硫化氢环境井下作业场所作业安全规范.pdf VIP
文档评论(0)