- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
06269-工程应用英语-1
52. Conventional ground surveys were the original location techniques available to highway engineers until developments in electronics. The most important equipments used were the transit, the level, and the tape.
最初的公路定位技术一直使用传统地面测量技术直到电子技术的发明为止。这些重要的设备是经纬仪、水准仪、和卷尺’s social, economic, and physical structure.
城市的交通系统是城市的社会、经济和物质结构的基本组成成分。任何结构的设计首先应包含确定荷载和其他设计因素,这些因素由结构来抵抗,因此在设计中必需考虑前期的踏勘工作要建立一条或几条可能路线的主要控制点和次要控制点,并且在有限宽度地带内,可能在几百英尺范围内,确定每条路线的位置。施工计划和条例必需满足材料和施工的程序要求。在大多数城市一般小车平均载人少于一点五人21.The unit price contract is adapted to highway engineering, because usually it is not possible to determine exact quantities of some items of work _when_ construction is completed.
22.The word ‘contract’ is derived from the Latin ‘contractum’, meaning _drawn_
Together.
24._Highway transportation_ is the dominant transportation mode in passenger travel.
25.The Portland cement concrete commonly used for rigid pavements consists of Portland cement, coarse aggregate,_fine aggregate, water.
26.Rigid highway pavement can be divided into three general types: plain concrete pavements, simply reinforced concrete and _continuously reinforced concrete pavement_.
27.The simplest and generally least costly form of interchange is the _diamond_.
28.If distances are great and time is at a premium, _air_ transportation will be selected.
29.Signing for freeways should be planned concurrently with the _geometric_ design.
30.Major drainage structures are usually large bridges and multi-span _culvers_.
Easement curves have been used by the railroads for many years, but their adoption by highway agencies came much later.
铁路在很多年前就使用缓和曲线,但公路部门对他的采用却晚的多。如果高峰时期的可以延长更长一点时间的话就可以降低交通堵塞“result” or “end result”, stipulates the desired end product and leaves manner and method to the contractor.
另一种称为结果和最终结果,规定预期的最终产品,将方式和方法留给承包商去选择用于高速路的标志的设计与线性设计同时进行natural water courses. Such an undertaking requires thorough engineering analysis.
同样,在改变自然水道时,要尤为注意,在此过程中,一定要进行全面的工程分析。
(
Professional English Test A
Part
文档评论(0)