- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
世界最高建筑的混凝土施工方案
The concrete construction scheme of the tallest building in the world
Liuhuibin
At the beginning of November 2007, one of the world,s new concrete pump height was born, 601m! The record is composed of ultra high pressure Putzmeister concrete pump in the world,s tallest building - the United Arab Emirates (Burj Dubai Tower) to create the Burj Dubai in construction. The 601m pumping height ineludes a tubular column and fixed cloth rod, is calculated from the fixed length of the riser in building structure and vertical pipeline length, concrete pouring practice is carried out in 585m height, ideal pumping height has been up to 611m!
The United Arab Emirates Burj Dubai will exceed the height of 800m, the core tube tower construction began in early 2005, the installation of 3 sets of Putzmeister concrete pump, 1 sets of complex pipeline system and 4 fixed cloth rod and the special properties of concrete? Due to the rapid progress of construction, the higher the building, the narrower the structure, the 4 of the 3 fixed distribution rod and 1 pumps were removed. Putzmeister these devices in the engineering construction has withstood the test, and played a great role?
prepare the test
Company service providers Unimix concrete suppliers and pump the United Arab Emirates Burj Dubai sent the full trust of
Putzmeister company,s technical level and reliability on Putzmeister company decided to entrust the supply and installation of pump and cloth rod system? By the early pump test, Putzmeister company has identified pumping height of more than 600m concrete pump and concrete conveying pipe, its export capacity is 30m3/h? For stability, the top of the building will begin with a lightweight steel structure from the 156 floor, and the concrete floor will be poured into the 160th floor of the 611m.
Drag pump transportation simulation of 1. 1 super high-rise building
At the beginning of 2005, Putzmeister at the construction site of headquarters in Germany and Dubai w
您可能关注的文档
- 世纪同步精练高三生命科学拓展型课程讲稿.docx
- 世纪小区CFG桩基础施工合同.docx
- 世纪新城法兰西别墅下阶段整体推广方案.docx
- 世家服装公司开业庆典策划方案.docx
- 世界艾滋病日“远离艾滋,关爱生命”倡议书及建议书.docx
- 世界艾滋病日活动策划及文案.docx
- 世界艾滋病日宣传活动方案范文.docx
- 世界艾滋病日演讲稿及演说稿.docx
- 世界艾滋病日主题班会活动策划书及文案.docx
- 世界残疾人日策划书及文案.docx
- 2025中国冶金地质总局所属在京单位高校毕业生招聘23人笔试参考题库附带答案详解.doc
- 2025年01月中国人民大学文学院公开招聘1人笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
- 2024黑龙江省农业投资集团有限公司权属企业市场化选聘10人笔试参考题库附带答案详解.pdf
- 2025汇明光电秋招提前批开启笔试参考题库附带答案详解.pdf
- 2024中国能建葛洲坝集团审计部公开招聘1人笔试参考题库附带答案详解.pdf
- 2024吉林省水工局集团竞聘上岗7人笔试参考题库附带答案详解.pdf
- 2024首发(河北)物流有限公司公开招聘工作人员笔试参考题库附带答案详解.pdf
- 2023国家电投海南公司所属单位社会招聘笔试参考题库附带答案详解.pdf
- 2024湖南怀化会同县供水有限责任公司招聘9人笔试参考题库附带答案详解.pdf
- 2025上海烟草机械有限责任公司招聘22人笔试参考题库附带答案详解.pdf
文档评论(0)