- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
AZRAQ X TOP AG-2E STRUCTURE MAP Test No. Formation Interval (m KB) Results Remarks 1 ? Abu Gabra ? ? ? ? ? ? ? ? ? 1967.5 – 1974.0 WHP: 118.53 psi Well flowed for 2.5 hrs then resumed swabbing: Pulled 73 swabs recovered: 286.3 bbls of oil BSW: 0%. Shut-in for main pressure build-up WHP: 400.74 psi Well flowed for 7.5 hrs then dead Total oil recovered 350.7 bbls Gas rate: 0.505 mmscf/d API of oil: 36.6 . CO2: 0%, Choke size: 24/64” 28/64’’. ? 2 ? ? ? ? ? Abu Gabra ? ? ? ? ? ? 1857.5 – 1863.0 Pulled 39 swabs. Recovered: 86 bbl of oil BSW: 0%. API: 19.27. Cl-1: 1200 ppm CO2: 0%. ? Fluid level: 1750.0 m KB. Choke size: 96/64”. Poor influx. ? (28 Jul – 14 Aug 2013) AZX-03 Testing Result Justification for selecting AZX-03 1- For the interval AG (1857.5 - 1836.0) after 39 swabs Pulled, 86 bbl of oil Recovered with BSW: 0% and fluid level is 1750.0 mkb which considered Poor influx. 2- The interval AG (1967.5 -1974.0) reported high GOR, Gas rate: 0.505 mmscf/d. 3- The well now is Idle. . BB-13 BAM-13 Well History: June 2006: the well completed in Arad E (1279-1281), B1A (1290-1293) B1B (1301-1304) mkb . 8-April -13 to 22-April -13 : B1B (1301-1304) mkb Isolated for high water. Swab test Arad E (1279-1281) and B1A (1290-1293) comingled: Pulled 74 swabs, total fluid recovered 36.85 m3, water cut 45%, Initial fluid level 100m, final fluid level 1100m. Set DBP @ 1049.94mkb and suspended the well on April 22. 2013. Well status: Idle. Date Action Intervals Layer 22-Jun-06 Tested water 1083 1085 Aradeiba E 22-Jun-06 Completion 1279 1281 Aradeiba E 22-Jun-06 Completion 1290 1293 Bentiu 1A 22-Jun-06 Completion 1301 1304 Bentiu 1B Zone Name Top Bottom Gross Net N/G Av Phi Av Sw Ard E 1279 1281 2.06 0.76 0.37 0.166 0.968 B1A B1B 1291 1306 14.56 4.88 0.335 0.205 0.707 Petro physical summary: Completion: BB-13 (PROPOSED ) BB -13: Plan1( Team Proposal) BB-13 (CURRENT) Ara
文档评论(0)