- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业论文外文翻译-高层建供配电系统设计
Power supply system of high-rise building design ? Abstract: With the continuous development of city size, more and more high-rise buildings, therefore, high-rise building electrical design to the designers had to face. In this paper, an engineering example, describes the electrical design of high-rise buildings and some of the more typical issues of universal significance, combined with the actual practice of an engineering solution to the problem described. Key words: high-rise building; electrical design; distribution; load calculation 1 Project Overview The commercial complex project, with a total construction area of ??405570m2, on the ground floor area of ??272330m2, underground construction area of ??133240m2, the main height of 99m. Project components are: two office buildings, construction area is 70800m2, 28 layers, the standard story is 3.2m. 2 Load Calculation 1) Load characteristics: electric load, much larger than the national civil engineering technical measures Large 120W/m2 indicators, especially in the electricity load more food, and different types of food and beverage catering different cultural backgrounds also high. 2) the uncertainty of a large load, because the commercial real estate rents are often based on market demand, and constantly adjust the nature of the shops, making the load in the dynamic changes. 3) There is no specification and technical measures in the different types of commercial projects refer to the detailed parameters of the shops, engineering design load calculation in the lack of data, in most cases to rely on staff with previous experience in engineering design calculations. Load the selection of parameters: for the above problems, the load calculation, the first developer of sales and good communication, to determine the form of layers of the forms and nature of floor area, which is calculated on the basis of electrical load basis; followed to determine parameter index within the unit area of ??shops is also
您可能关注的文档
- 毕业论文外文翻译-影响中国的人民币汇率变动对农产品出口影响:出口到日本的案例.doc
- 毕业论文外文翻译-建设工程项目管的方法论研究.doc
- 毕业论文外文翻译-息系统开发和数据库开发.doc
- 毕业论文外文翻译-引和留住人才.doc
- 毕业论文外文翻译-微计算机控制系统(单片机控制系统).doc
- 毕业论文外文翻译-我商业银行个人理财业务的战略研究与发展现状.doc
- 毕业论文外文翻译-我们招聘如做到文化第一,技能第二.doc
- 毕业论文外文翻译-建筑结构整体设计-建筑创和综合技术.doc
- 毕业论文外文翻译-息系统的业务趋势和后果.doc
- 毕业论文外文翻译-我国企业跨国并购财务风险析及防范—以中国移动并购巴科泰尔为例.doc
文档评论(0)