- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Method Statement for Excavation at Rock Quarry(revised)
Method Statement for Excavation at Rock Quarry
1. Introduction of Construction
1.1. Introduction of Construction
Quarry is located at the right bank of Bung River and is 7km from dam, with a reserve of 1,980,000m3 and quantity of exploitation is about 1,450,000 m3.
1.2 Geological Conditions
Burden layer of quarry is mainly primitive forest and diameter of tree is 10-30cm and the trees are about 5-10m high. Average thickness of soil layer is 7.6m and the quantity is about 525,000m3. The rock exploited is granite with an average thickness of 30m.
1.3 Construction quantity
Construction Quantity of Quarry
No Item Unit Quantity Remarks 1 Earth Excavation m3 525000 2 Rock Excavation m3 1455000 2. Layout of Construction
2.1. Layout of Construction Road
2.1.1 The Road Connect with Quarry
D18 road: A Zigzag road from certain point of 14D national road will be built, leading to rock storage, workshop of crushed stone and quarry at EL321.00m. Foundation is 8m wide and surface is made of crushed stone and 7m wide. Gradient is controlled within 11%. It is mainly used as construction road outside the excavation scope.
2.1.2 The Road within the Quarry
R1 road: It is connected to D18 road and built to EL370.0m from EL321.0m in Zigzag line, as a construction road within excavation scope. Foundation of Zigzag road is 6.5m wide and the surface is made of crushed stone and 6m wide. Gradient is controlled within 10%. Construction road for excavation of layering will be built to working face from corresponding elevation of Zigzag road, along contour line. Its foundation is 4.5m wide and the surface is made of crushed stone and is 4m wide.
R2 road: It is connected to R1 road and from EL321.0m in Zigzag line, as a construction road for EL.334~EL.322 excavation. R2 road will be rebuilt as main road of EL.322~EL.310 excavation after finished excavation above EL322. Foundation of Zigzag road is 6.5m wide and the surface is made of crushed stone and 6m wide. Gradient is contr
您可能关注的文档
最近下载
- 校园交通管理制度.doc
- 霍尼韦尔honeywell ST 3000 Smart Transmitter Release 300 Smart Field Communicator Model STS103 User Manual说明书用户手册.PDF
- 职业中专教职工考核办法.docx VIP
- 人教版二年级数学上册单元过关测试题全套含答案.pdf
- 牛肝菌可行性研究报告(优秀可研报告).pdf
- 全国生态环境监测专业技术人员大比武理论试题集打包(共14章,820页) .pdf
- 2023“道中华”铸牢中华民族共同体意识知识竞赛试题答案汇总.docx VIP
- 中国船舶集团有限公司_信用水平分析报告_企评家.pdf
- 医疗管理中的合规与风险管理探索培训课件.pptx
- 部编版语文一年级上册第8单元教案(新教材).doc
文档评论(0)