- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Bored Piling Method Statement 灌注桩施工方案
Table of Contents
General
Setting out
Drilling
Piles Termination
Clearing of Pile Base
Installation of Reinforcement
Placing of Concrete
Testing of Concrete
Possible Problems Encountered
Noise And Vibration
Hazard Analysis
Method of Locating And Avoidance of Utility Services
Bored Pile Record Sheets
General
The general sequence for bored pile works is shown as below: -
Figure 1: Flow Chart For Bored Pile Process
Setting Out
In house surveyor will set out the pile location with reference to the control point established by the licensed surveyor. Prior to boring, the pile point shall be checked and offset along the 2 main axis for checking any deviation during initial boring.
Drilling
Before boring, the supervisor/ project manager shall verify all associated technical information such as presence of services, pile co-ordinates, platform level, cut-off level, validity of drawings and etc.
The pile boring operations will be performed by the flight auger or boring bucket attached to a hydraulic drilling unit which is mounted on a crawler crane.
The verticality of bored hole will be checked from time to time from the top while advancing the bored hole. Sighting plumb line shall be used to check the verticality of the Kelly bar of boring machine against 2 major axis. The checking shall be carried out before and during boring process at regular interval to ensure boring hole is constructed and completed within tolerance.
Steel casing of adequate thickness shall be used to prevent unstable soil from caving into the bored hole for the first 6~12m of the soil strata. The casing will be installed by vibrating hammer or driven by the boring rig. Water shall be utilised as a medium stabalising fluid in the process of forming the borehole.
During the boring process, the water level shall be kept as high as possible within the casing and well above the existing ground water level.
Rock drilling tools or chisels shall be used to drill into rock. The clerk of work or engineer sha