联合体项目合作模式介绍 .pptVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
联合体项目合作模式介绍

PROJECT DESCRIPTION The main components of the Project includes: Main Turbine Island Main Boiler Island Coal Handling System Ash Handling System Cooling Water System Water Treatment System Auxiliary Buildings (Balanced of Plants) External Network and Infrastructure Switchyard Transmission Lines Contractor’s Temporary Facilities DIVISION OF WORKS To undertake the EPC Works for the Fired Power Plant, a Consortium Organization between Leader and Partner is formed. The formation of this Consortium is to draw the maximum potential resources from each individual company for the realization of the power plant. To prevent any mismatch of responsibilities and overlapping duties, Leader and Partner have develop a comprehensive detailed scope of works as outline in the Division of Works (D.O.W) and the Division of Responsibilities (D.O.R). The Consortium Leader-partner shall appoint a Design Institute who is responsible for the overall plant layout, concept and system design for the completion of the power plant. Leader’s ROLE RESPONSIBILITY AS CONSORTIUM Responsible for leading and coordinating the supply, erection, testing commissioning of equipment and interfacing with the Design Institute and Main Civil works contractors. Chairman for commercial and administration, project planning coordination Partner’s ROLE RESPONSIBILITY AS CONSORTIUM Alternate Chairman for commercial and administration, project planning coordination Responsible for the coordination of the site management facilities and logistics. Active interaction coordination of interfacing activities among working partners. PROJECT IMPLEMENTATION OUTLINE * Project Presentation XXX Consortium Design Construction for the Complete Power Plant Civil Works ME Building Services Foundations Structures Roads Buildings Stack Sub-Station Transmission Lines Structures Supply, Erection, Testing Commissioning of the Main Equipment of the Power Plant :- Turbine Island Steam Turbines Water-

文档评论(0)

shenlan118 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档