机电标准化(Mechanical and electrical standardization).docVIP

机电标准化(Mechanical and electrical standardization).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
机电标准化(Mechanical and electrical standardization)

机电标准化(Mechanical and electrical standardization) In order to strengthen the equipment management of the coal preparation plant and ensure the normal operation of the equipment, the overall improvement of the mechanical and electrical management level and the maximum efficiency of the equipment have been made. Once every ten days, check the quality of mechanical and electrical standards, and check the results. Carry out routine mechanical and electrical management inspection, find out the hidden trouble, rectify in time, ensure the equipment running normally. Regularly hold the monthly summary of the mechanical and electrical work of the coal preparation plant. Electromechanical quality standardization examination consists of nine items, which are mechanical indicators of assessment, assessment, and on-site assessment based electrical equipment inspection, operation assessment, preventive maintenance assessment, electromechanical accident management assessment and lubrication management assessment and material management inspection, pressure vessel and portable tank, flammable and hazardous chemicals, lightning protection ground construction management assessment. I. mechanical and Electrical Indexes 1, equipment readiness rate: in good condition, the number of units / equipment in the total number of *100% or spot checks, equipment in good numbers / check the total number of equipment *100%, sampling equipment at least 50 units. The monthly coverage rate is 100%. 2 equipment repair rate: (number of equipment to be repaired, the number of days * days to be repaired / total number of listed equipment * days of the month) * 100%, no more than 2%. 3, equipment accident rate: (the number of equipment in the accident table / total number of equipment listed) * 100%, no more than 1%. 4, 10000 tons of coal failure rate: month failure, downtime (hour) / raw coal into the wash volume (10000 tons), 10000 tons of coal failure rate, the monthly assessment index is 1 hours / ton.

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档