机电案例(Electromechanical case).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
机电案例(Electromechanical case)

机电案例(Electromechanical case) Electromechanical case.Txt 2, bidding in the four time: 5, 15, 20, 30 5 days: from the date of the tender documents sold to the date of the cessation of the sale, the minimum amount of not less than 5 working days. 15 days: the tenderee shall modify the bidding documents issued at least 15 days prior to the deadline for the submission of the tender documents. 20 days: from the date of submission of tender documents to the deadline for bidding documents, the minimum shall be no less than 20 days. 30 days: the contract shall be signed within 30 days from the date of issue of the bid winning letter. The bid bond shall not exceed 2% of the total bid price, and shall not exceed 800 thousand of the bid price. 4, bid opening: The host is the tenderee; The time of bid opening is the same as the deadline for submission of bids. 4. Procedures for claims: 3 28 days: (1) the construction entity shall issue a claim within 28 days after the claim; (2) the construction unit shall submit a claim report to the supervisor within 28 days after the claim has been sent back; (3) the supervisor shall reply within 28 days of receipt of the claim documents. 5. Force majeure claims: (1) the casualties and losses of the two parties shall be borne by the unit where they belong, and shall bear the corresponding expenses; (2) the damage of the project itself shall be borne by the owner; (3) during the period of stoppage, the construction unit shall be required by the engineer to stay in the construction site, and the expenses of the security personnel shall be borne by the employer; (4) the cost of cleaning and restoration shall be borne by the owners; (5) the damage of machinery and equipment and the stoppage of work in the construction units shall be borne by the construction units; (6) time limit for a project is postponed. In a word: the expenses are respective, the construction period is postponed! 6, determine whether the claim is established Qualification cer

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档