新品管七工具(New tube seven tools).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
新品管七工具(New tube seven tools)

新品管七工具(New tube seven tools) It is a scientific management method for arranging and preparing the best schedule and effectively implementing the management schedule. The tool is an arrow chart. The arrow chart is a kind of arrow line represented by the network form according to its chronological order and subordinate relation. A task or project, can be divided into many operations, these operations depend on each other, in the production process and organization of mutual restraint, arrow bar chart can put this operation between the dependent and restrictive relationship clearly expressed. Through arrow charts, key and non key factors affecting the progress of the project can be found out. Therefore, it is possible to co-ordinate and coordinate the rational use of resources and improve efficiency and effectiveness. In terms of schedule and progress kilometres, Gantt Chart is often used. Gantt charts can only give rough plans, simple job instructions, and because of the lack of dependencies between jobs, there are the following disadvantages: 1. it is difficult to give very detailed plans; 2. in the planning stage is not easy batted and thinking; 3., after entering the implementation stage, changes in circumstances and planning changes are difficult to deal with; 4. unable to obtain the correct information about the delay of an operation affecting the whole plan; 5., the design scale is larger, that is difficult to master the overall plan; 6. difficult to determine the focus of progress. In the late 50s, when the United States Navy made the Polaris missile development plan, in order to make up for the lack of Gantt chart, a new plan management method was proposed, which was called plan review method (PERT-Program Evaluation, Review, Technique), so that the missile development task ahead of schedule more than two years to complete. In 1956, DuPont and Rand Co in the United States, in order to coordinate the work of different business departments within the company, pu

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档