主井10kv变电站操作规程(Operation regulation of main shaft 10kV substation).docVIP

主井10kv变电站操作规程(Operation regulation of main shaft 10kV substation).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
主井10kv变电站操作规程(Operation regulation of main shaft 10kV substation)

主井10kv变电站操作规程(Operation regulation of main shaft 10kV substation) This paper consists of 286944128 contributions RTF documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Operation rules of master on duty at 10KV station of main shaft, operation rules of operator on 10KV station of main shaft 10KV I. requirements for starting a job 1., must undergo professional and technical training, examination qualification, certification. 2. grasp the electric shock emergency method, and have the electrical equipment fire prevention and fire extinguishing knowledge. 3. diseases that do not interfere with ones work. Two. Safety regulations 1., no alcohol before work, strictly implement the shift system, do not take off, do not gang up, do nothing related to their work, strictly abide by the relevant provisions. 2., strict implementation of the work ticket system, work permit system, work guardianship system, the work of the end of the relevant provisions of the system. 3. the operation of the switch must be carried out by two persons, one of whom is more familiar with the equipment as guardian and the other as operator. 4., the operation should be simulated on the analog screen before operation, without error, the actual operation can be carried out. Operations are strictly forbidden to do nothing to do with the operation. 5. operation must be performed when the repeat monitoring system, according to the operation sequence of operations, each operation end of a do a tick, all the operation after the review, there is no incorrect report or relevant person in charge of scheduling. 6. when the power supply operation is carried out, it is necessary to confirm that the personnel on the line have been completely evacuated so as to transmit electricity. 7., when operating doubt, not allowed to change the operation record and operation ticket, must report to the dispatcher and the monitor, clear

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档